Mitsubishi Tech Support

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg
Showing posts with label "BWR". Show all posts
Showing posts with label "BWR". Show all posts

Friday, 22 April 2011

Friday morning update.... it's Earth Day

Posted on 06:42 by Unknown
Plant data from Fukushima Daiichi remains fairly constant, with the reactor plants showing continued slow cooling. In fact, it's been released that the latest NRC consideration of the situation is that it is "stable, but fragile." This of course refers to both the potential for either loss of cooling to the cores, or else further possibly sudden release of contamination to the environment, which most likely would be a release of contaminated water.

TEPCO continues to pump water out of No. 2 plant, as reported everywhere, and intends to double pumping capacity within about a week.

As Earth Day 2011 progresses, we also find in the headlines in Japan the stories that the remaining reactor plants at Kashiwazaki Kariwa, the largest nuclear generating station in the world, will not be allowed to restart until the Fukushima situation is resolved (being stopped apparently by local government) and we also see the hint that Fukushima Daini will not be allowed to restart until certain safety guarantees are made (this stoppage by the prefecture's governor.) TEPCO certainly has its hands full, and will be very short of power come the summer if all of these reactor plants are kept shut down.

Having said that, it is of course imperative, given Fukushima Daini's closeness to the now highly-active earthquake zone off the northeast coast, that TEPCO perform major modifications to the plants at that site and improve tsunami protection before those plants can be allowed to restart. The case against idle reactors at Kashiwazaki Kariwa, where some reactors have never shut down (there are seven on site) is much less easy to make considering that it's on the opposite coast.

Also, given that it's Earth Day, we might expect a horde of articles to appear today against nuclear energy in the United States. The more informed authors might target boiling water reactors. However, it's important to note the modifications and alterations made to all US BWR plants that use Mark I containments, as delineated by the NRC site and given some analysis by your author:

1. In 1979, backup safety systems were separated. This means that backup systems like diesel generators were made fully and totally independent in all aspects. This might include ensuring completely separate water cooling for the diesels, it might include totally separate buses the diesels power, and even separated locations. What this step did was eliminate the chances that a problem in one backup safety system could have a negative effect on the operability of another.

2. In 1980, control rooms were reconfigured to improve operability and analysis of information by plant operators.

3. In 1980, the suppression chambers were strengthened. It had been recognized that the strength of the torus section of the Mark I containment could be considered a weak point of the design, regarding ability to hold structural integrity against severe accidents and a backfitting / rebuilding program was performed to strengthen this portion of the physical containment. (This might have helped Fukushima Daiichi No. 2, whose suppression chamber is damaged.)

4. In 1988, more batteries were added at all stations to protect against SBO or Station Blackout. As readers here now know, longer battery life delays core damage if there are no sources of AC or DC available either offsite or from EDG power.

5. In 1992, vents were added to vent the primary containment directly to atmosphere if necessary. These vent pipes, with valves in the vent path to maintain primary containment integrity while still allowing a direct vent path through a high point stack if necessary, are intended to vent hydrogen directly to atmosphere instead of allowing it to build up inside the primary and possibly leak to spaces in the reactor building. (This might have aided No. 1, 2 and 3 plants at Fukushima Daiichi.)

6. In 2002, plants added another spare portable diesel generator and water pump. The need for this is obvious, given the events at Fukushima Daiichi. These have been present at US plants now for a number of years.

We can see then that there are many things that might be considered superior points in the construction and operation of US BWR plants as compared to those at Fukushima Daiichi, and in fact these are just a few of the differences. The nuclear power establishment in this country has learned from past accidents and incidents, and many many reactor-years of operation in a number of programs. We need to all keep this in mind as Earth Day 2011 progresses, and the environmental voices begin to rise in volume.

Just six months ago, nuclear energy was one of the darlings of the green movement and environmentalists and climatologists in many places the world over. We must thus also remember that what's happening in Japan is the 'worst case' scenario, in which a major natural disaster overwhelms all active and passive core safety protections. Knowing the differences here in the USA compared with Japan, we can.. and should.. rest very comfortably at night.

10:00 AM Eastern Friday 4/22
ATOMIC POWER REVIEW
Read More
Posted in " fukushima daiichi", "BWR", "earth day", "mark I" | No comments

Tuesday, 12 April 2011

Boiling Water Reactors... some further details.

Posted on 11:03 by Unknown
Now that we're seeing a further media explosion about the Fukushima Daiichi accident being raised to an INES Level 7 event, there are sure to be a lot more questions... and a lot of implications to US plants and plants everywhere else. It's time to take a little closer look at some of the features of the plants there at Fukushima as best we can ascertain from here.

Readers of this blog already know a lot about the setup of the relationships that have to be arranged when a nuclear plant is to be built. If you did not see the article on that, then please click here and read this first. Remember that different architect-engineers will design buildings and structures for a given job differently, and specs provided by the owner-operator can vary. Further, plants built over a span of time have to comply with newer and newer regulations and some of the new requirements are also fitted to older plants when necessary.

We've also talked a bit in the past about containment designs, and shown the evolution of BWR containment. If you are not familiar with this, then click here for a good primer on this, and then click here to see some more information. Readers might also want to revisit our most popular online article on the BWR DRY WELL which will cover the function and construction of this feature.

With that background behind us, let's stop a moment and note that while there are many mentions of the containment designs relative to Fukushima, and elsewhere (these are the MkI, the MkII and MkIII Boiling Water Reactor Containment) there is only scattered mention of the actual reactor design. Actually, this has gotten a bit more coverage than one might think because every single JAIF status chart from very early on until now has listed the core type of the plants at Fukushima Daiichi, as separate from the containment types. Fukushima Daiichi No. 1 is a BWR/3 reactor core design; Nos. 2 through 5 are BWR/4 reactors while No. 6 is a BWR/5 reactor.

These are generational designations created by GE to describe, generally, design features of a reactor core, core vessel and some supporting systems. There were a variety of power ratings for each style of core, using more or less fuel elements so that simply seeing a "BWR/4" designator doesn't necessarily imply the actual core thermal power rating.

There are many differences between the actual reactor models, although after a time some parts are standardized (especially concerning control rod drive.) However, from BWR/3 on, jet pump core recirculation was used and since all involved plants there are this model or newer, let's begin right there with a look at the actual core flow, and in-vessel design in normal operation at one of these reactors. We'll use a simplified WASH-1250 schematic for core flow in a jet pump BWR reactor.

Following the path of water flow beginning at the feedwater line, we see that this water enters the pressure vessel though the feed nozzle (a term we've seen here a lot, since it's one of the few working temperature indicators at the plants) and moves down around the outside of the core barrel into an annular plenum space. Some of the water goes all the way down and is taken into the suctions of the recirculation pumps, where it's pressurized and blasted down through a nozzle pointing into the throat of the jet pump inlet. This is where the rest of the feedwater goes; this jet pump puts a strong suction on the throat and sucks in feedwater from the plenum, which then enters the lower area of the reactor vessel below the core.

As the water then rises up through the core, it is heated as it passes through the core assembly. Some of the water begins to boil, and more and more of it is boiling as the mixture reaches the top of the core. This violent mixture of steam and water is separated by several series (not shown in detail in this drawing) of moisture separators that use either a swirling, centrifugal action or else baffles to make the water droplets fall out of the steam. The now fairly pure steam exits the top of the moisture separators and exits the vessel through the steam line, while the saturated water falls back to be mixed with the incoming feed water in the outer plenum, helping pre-heat this feedwater.

Now, this is a very simple drawing. Let's take a look at another one, from WASH-1082 that shows a BWR of the vintage we're concerned with at Fukushima Daiichi to see how this theoretical design is actually manufactured.

We can see the feedwater inlet on the right, high up, and the steam outlet on the left of this drawing, also high up. The jet pumps can be made out standing in the space between the core barrel and the pressure vessel; see the paired venturi type jet pumps on the left. The recirculation pumps are of course electrical, and are right near the reactor vessel, inside the dry well.

Let's point out one technical fact here; One of the aspects of this design worth noting is the fact that if anything in the recirculating line breaks, allowing water to exit through this line, then this can only drop water level IN THE CORE as low as the top end of the jet pump inlet nozzles. This height is about 2/3 of the way up the active core region. As we will see, there are quite a number of other pipes that tap off the recirculating water piping. This could well explain some of the problems with core cooling at Fukushima Daiichi's reactor plants... if any plant has any leakage or failure in this piping, it could leave up to 1/3 of the core upper end not submerged in water. We already know that the upper portions of the core on all three plants are damaged, and in fact No. 1 plant is said to have over 2/3 of the core damaged.

Also, in the above drawing, look for the core plate. This is a heavy plate lower in the reactor vessel, with round holes in it. The label is on the right. This is the plate on which the fuel assemblies sit. This plate is pivotal in core melt scenarios; one major question being "Does the core melt cause failure of the core plate allowing core material to drop to the bottom of the pressure vessel or not?" If a large amount of the core fuel assemblies melt and drop onto the plate, it could conceivably fail. Further, it's also obvious that melting and demolishing of parts of the core could easily lead to blockage or restriction of water flow through the core itself.

Now look at the very base of the drawing, showing the heavy support on which the reactor sits; inside this are the control rod drive mechanisms. Early on, flooding of the drywells was discussed a great deal (this could take up to 6 hours or so to accomplish just up to the reactor vessel support skirt) and here we see one thing that hurts the ability of this action to remove heat from the reactor; air would be trapped in this area as the dry well filled, limiting the height to which water would enter the area of the vessel support skirt on this design.

Let's take a look at yet another picture of a containment building, again a Mk I containment housing a BWR/4 reactor. This is probably the closest illustration we've yet put up to the actual structures at most of the Fukushima Daiichi plants.

This is from WASH-1082. The building foot is 14 feet below ground. The refueling floor, commonly mentioned in articles about Fukushima here and elsewhere and clearly marked on this drawing is 149 feet above the building foot level.

In our next installment we'll look at some of the actual fluid systems involved to get a better idea of what TEPCO is trying to restore access to, and use of.

3:00 PM Eastern Tuesday 4/12
ATOMIC POWER REVIEW
Read More
Posted in "BWR", "containment", "fukushima daiichi" | No comments
Older Posts Home
Subscribe to: Posts (Atom)

Popular Posts

  • Steam Generators: Design and details
    A recent NRC blog post ( see here ) brings up a matter that has come into focus of late at San Onofre Nuclear Generating Station in Californ...
  • The 136th Carnival of Nuclear Bloggers
    I find myself on this December 23rd, making the Atomic Power Review entry hosting the 136th Carnival, thinking about all of the great achiev...
  • Nuclear Icebreakers 101
    An addendum for National Nuclear Science Week - Day 3 In the previous post I gave the briefest overview of the history of the Russian fleet ...
  • San Onofre Nuclear Generating Station Virtual Tour
    Press release from Southern California Edison, courtesy Jennifer Manfre, Senior Manager, Media Relations for SCE. --------------------------...
  • Xenon / Fukushima Daiichi No. 2 - Thursday afternoon update
    The information at present from TEPCO echoes that printed here this morning. Here is the latest TEPCO analysis: -We found a possibility to d...
  • 60th anniversary of EBR-I power generation
    Yesterday and today mark an important event in nuclear energy history; these two days are the span during which the EBR-1 reactor plant, whi...
  • Carnival of Nuclear Bloggers comes to APR
    60th Carnival of Nuclear Bloggers Atomic Power Review is very proud to host, for the first time, the rotating Carnival. This feature present...
  • The 84th Carnival of Nuclear Bloggers
    Once again Atomic Power Review is proud to host the rotating Carnival of Nuclear Bloggers - this, the 84th edition. This feature travels aro...
  • INFOCAST Press Release: Waste Confidence Conference in October
    Press Release below from Infocast.  See link button on right sidebar to access the Infocast site page covering this timely and relevant conf...
  • The effect of big media: A real conversation
    I recently had a conversation with a friend of mine that interestingly turned nuclear. She's married, mother of one beautiful nine month...

Categories

  • " fukushima daiichi"
  • "accident"
  • "alloy"
  • "ameren"
  • "american nuclear society"
  • "annealing"
  • "anniversary"
  • "ans"
  • "anti-nuclear"
  • "AP1000"
  • "arco"
  • "areva"
  • "asn"
  • "associated press" "NRC" "NEI"
  • "atomic journal"
  • "babcock"
  • "blackout"
  • "bloggers"
  • "boron"
  • "brazil"
  • "breeder reactor"
  • "breeder"
  • "browns ferry"
  • "browns ferry" "nine mile point"
  • "BWR"
  • "calhoun"
  • "callaway"
  • "carnival"
  • "chernobyl"
  • "china"
  • "chubu electric" "hamaoka"
  • "chubu" "hamaoka"
  • "chubu" "hamaoka" "tepco" "fukushima daiichi"
  • "chubu" "kyushu" "nisa"
  • "COL"
  • "commissioners"
  • "containment"
  • "contaminated"
  • "cooling"
  • "cooper" "ft calhoun" "flood" "missouri river"
  • "core damage"
  • "criticality"
  • "davis-besse"
  • "delta IV"
  • "dresden" "boiling water reactor" "containment"
  • "dry dock"
  • "dry well"
  • "earth day"
  • "earthquake"
  • "EBR"
  • "ebwr"
  • "education"
  • "elk river"
  • "embrittlement"
  • "enclosure"
  • "energy policy"
  • "equipment"
  • "fabrication"
  • "fermi"
  • "fire"
  • "flood"
  • "frontline"
  • "ft calhoun"
  • "ft calhoun" "oppd" "flood"
  • "ft st vrain"
  • "fukushima daiichi"
  • "fukushima daiichi" "BWR"
  • "fukushima daiichi" "nisa" "tepco"
  • "fukushima daiichi" "tepco"
  • "fukushima daiichi" "tepco" "dry well" "containment" "pressure vessel"
  • "fukushima daiichi" "tepco" "iaea"
  • "fukushima daiichi" "tepco" "kurion" "areva"
  • "fukushima daiichi" "tepco" "nisa"
  • "fukushima daiichi" "tepco" "nisa" "genkai" "pressure vessel"
  • "fukushima daiichi" "tepco" "nisa" "jaif"
  • "fukushima daiichi" "tepco" "nisa" "japan"
  • "fukushima daiichi" "tepco" "nisa" "jsc" "road map" "recovery"
  • "fukushima daiichi" "tepco" "nisa" "spent fuel" "pool"
  • "fukushima daiichi" "tepco" "nitrogen"
  • "fukushima daiichi" "tepco" "robot" "video"
  • "fukushima daiichi" "tepco" "tokai" "japco" "iaea"
  • "fukushima daiichi" "tepco" "tomari" "hokkaido"
  • "fukushima daiichi" "tepco" "tsunami"
  • "fukushima daiichi" "tepco" "video"
  • "fukushima daiichi" "tepco" "video" "youtube"
  • "fukushima daiichi" "TMI" "public opinion" "survey"
  • "fukushima daiichi" "video"
  • "fukushima daiichi" 7 8 plants economic plan TEPCO
  • "fukushima daiichi" cooling water release sea ocean nuclear reactor accident NISA TEPCO pit trench tunnel
  • "fukushima daiichi" nuclear reactor accident contaminated water barge Suzuran Rosatom TEPCO
  • "fukushima daiichi" nuclear reactor accident contaminated water sea radwaste condensers nitrogen hydrogen inert
  • "fukushima daiichi" nuclear reactor accident earthquake onagawa TEPCO tohoku BWR nitrogen
  • "fukushima daiichi" nuclear reactor accident IAEA TEPCO update briefing temperatures pressures
  • "fukushima daiichi" nuclear reactor accident japan update color dye containment fabric update
  • "fukushima daiichi" nuclear reactor accident leakage sea seawater contamination tunnel trench cable pit
  • "fukushima daiichi" nuclear reactor accident liquid glass sodium silicate TEPCO
  • "fukushima daiichi" nuclear reactor accident nitrogen hydrogen inert dry well drywell
  • "fukushima daiichi" nuclear reactor accident nitrogen inert radiolytic radiolysis hydrogen
  • "fukushima daiichi" nuclear reactor accident polymer leak concrete contaminated contamination reactor pressure vessel containment cooling
  • "fukushima daiichi" nuclear reactor accident seawater contamination iodine tunnel trench TEPCO NISA JAIF
  • "fukushima daiichi" nuclear reactor accident site update status project future
  • "fukushima daiichi" nuclear reactor accident sodium silicate liquid glass diagram drawing perspective pipe tunnel trench contamination sea seawater
  • "fukushima daiichi" nuclear reactor accident TEPCO NISA JAIF update
  • "fukushima daiichi" nuclear reactor accident update TEPCO JAIF NISA
  • "fukushima daiichi" nuclear reactor accident water leakage contamination workers found dead
  • "fukushima"
  • "gas cooled"
  • "genkai"
  • "genkai" "embrittlement" "brittle" "pressure vessel"
  • "genkai" "kyushu"
  • "hack job"
  • "hallam"
  • "head"
  • "hearing"
  • "hearings"
  • "higashidori"
  • "hitachi"
  • "HNPF"
  • "hurricane"
  • "hydrogen"
  • "IAEA"
  • "icebreaker"
  • "IFR"
  • "INES"
  • "injection"
  • "irene"
  • "irrelevant"
  • "jaczko"
  • "jaczko" "NRC"
  • "JAIF"
  • "japan"
  • "kurion"
  • "kyushu"
  • "laguna verde"
  • "lenin"
  • "licensing"
  • "loop"
  • "lunch"
  • "marcoule"
  • "mark I"
  • "melt"
  • "meltdown"
  • "mexico"
  • "mitsubishi"
  • "MK I" "containment" "suppression" "youtube" "video"
  • "mPower"
  • "mPower" "Bechtel" "TVA" "babcock"
  • "national nuclear science week"
  • "nei"
  • "new nuclear"
  • "NISA"
  • "nitrogen"
  • "no 5"
  • "no 6"
  • "north anna"
  • "NRC"
  • "NRTS"
  • "nuclear aftershocks"
  • "nuclear energy institute"
  • "nuclear history"
  • "nuclear icebreaker"
  • "office for nuclear regulation"
  • "op-ed"
  • "op-ed" "carnival"
  • "op-ed" "fukushima daiichi"
  • "opinion"
  • "oversight"
  • "palisades"
  • "pbs"
  • "peer review"
  • "poll"
  • "PRA"
  • "press"
  • "pressure vessel"
  • "pressurized thermal shock"
  • "primary to secondary leak"
  • "PTS"
  • "public attitudes"
  • "PWR"
  • "RBMK-1000"
  • "RBMK-1500"
  • "RBMK-2400"
  • "RBMK"
  • "reactor safety"
  • "reading list"
  • "recriticality"
  • "Reid"
  • "reporting"
  • "restart"
  • "risk"
  • "robot"
  • "rod adams" "glenn williams" "interview" "atomic show" "the street"
  • "safety"
  • "san onofre"
  • "sarry"
  • "SBO"
  • "sheldon station"
  • "shippingport"
  • "SMR"
  • "solar"
  • "songs"
  • "south africa"
  • "south texas project"
  • "spent fuel"
  • "SSBN"
  • "steam generator"
  • "steam generators"
  • "steel"
  • "stress tests"
  • "submarine"
  • "support"
  • "Svinicki"
  • "sylcor"
  • "sylvania-corning"
  • "TEPCO"
  • "tepco" "tohoku" "kyushu" "japan"
  • "TMI"
  • "tokyo electric"
  • "Toshiba"
  • "twitter"
  • "UK"
  • "update"
  • "vermont yankee"
  • "vessel"
  • "video"
  • "virgil c summer"
  • "virginia"
  • "vogtle"
  • "wash-1250"
  • "WASH"
  • "westinghouse"
  • "westinghouse" "AP1000" "NRC"
  • "xenon"
  • "youtube"
  • ANO
  • ANS
  • arkansas nuclear one
  • Babcock
  • brittle fracture
  • brookhaven
  • carnival
  • crystal river
  • decommissioning
  • earthquake
  • enriched uranium
  • Entergy
  • fintan dunne
  • FirstEnergy
  • fresno
  • fuel elements
  • fukushima daiichi
  • higashidori
  • hurricane
  • hurricanes
  • industrial accident
  • INES
  • kashiwazaki kariwa TEPCO earthquake
  • kenya
  • license amendment
  • MHI
  • mitsubishi
  • mPower
  • NEI
  • northern fleet
  • nrc
  • nuclear electricity project
  • nuclear history
  • nuclear submarines
  • onagawa tohoku leak earthquake
  • OSHA
  • oyster creek
  • palisades
  • press release
  • pressurized thermal shock
  • PTS
  • retire
  • russian navy
  • san onofre
  • sandy
  • sce
  • sherrell r greene
  • shutdown
  • SMR
  • socal ed
  • songs
  • southern california edison
  • spent fuel
  • spent fuel pool
  • spent fuel pools
  • status
  • steam generator
  • steam generators
  • surry
  • sustainable energy today
  • sylcor
  • sylvania-corning
  • TEPCO
  • tohoku electric power higashidori onagawa LOOP fuel pool cooling
  • tokyo electric power company
  • unusual event

Blog Archive

  • ▼  2013 (71)
    • ▼  October (5)
      • South Korea: Cables fail tests; Government suing ...
      • SCE Requests Arbitration in SONGS Steam Generator ...
      • SCE Demands Mitsubishi Allow Contractually Mandate...
      • Resin-based solution to Fukushima water problems
      • SCE Demands Reimbursement from Mitsubishi for San ...
    • ►  September (5)
    • ►  August (9)
    • ►  July (5)
    • ►  June (6)
    • ►  May (2)
    • ►  April (8)
    • ►  March (13)
    • ►  February (13)
    • ►  January (5)
  • ►  2012 (159)
    • ►  December (6)
    • ►  November (7)
    • ►  October (13)
    • ►  September (7)
    • ►  August (19)
    • ►  July (15)
    • ►  June (16)
    • ►  May (17)
    • ►  April (13)
    • ►  March (14)
    • ►  February (14)
    • ►  January (18)
  • ►  2011 (270)
    • ►  December (22)
    • ►  November (21)
    • ►  October (20)
    • ►  September (21)
    • ►  August (17)
    • ►  July (23)
    • ►  June (24)
    • ►  May (44)
    • ►  April (78)
Powered by Blogger.

About Me

Unknown
View my complete profile