Mitsubishi Tech Support

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Tuesday, 10 May 2011

Fukushima Daiichi updates

Posted on 07:48 by Unknown
As work at the site really gets heavy in all areas of restoration, the news is beginninng to come out of Fukushima Daiichi fairly rapidly. Here are some of the most important updates I've seen.

-TEPCO has released a video of the spent fuel pool at No. 3 plant showing massive amounts of building debris in the pool. The debris includes steel I-beams, concrete and building material rubble, and masses of reinforcing iron bars as well as cables and other miscellaneous material. In fact, it's practically impossible in the video released to make any estimation of spent fuel condition because you can't see it.

-TEPCO indicates that calibration of water level indicating equipment at No. 1 plant is underway, in the effort to get the active fuel region covered with water. Contrary to some assertions elsewhere on the Internet, there is still apparently no direct flowpath THROUGH the fuel region of the reactor since injected cooling water is running down the outside of the core barrel to the egress points at the jet pump standpipes... if the TEPCO information about the actual feed injection point up until now remains valid (ie, the feed ring.) This allows heat removal from the core barrel, which itself is transferring heat from the fuel. However, the new plan is to raise water level in the dry well above that of the jet pump standpipes which will then allow internal level (inside the core barrel) above them as well. New feed into the core barrel will be established, along with the feed through the normal sparger ring as up to now. We published that drawing (for the new arrangement with dry well filled) a while back on this blog.

-Hampering the efforts however at No. 1 plant is the radiation level. While TEPCO has brought in some lead embedded sheeting, this material (which we understand is more blanket-like than steel plate-like) is not reducing the rad level as much as TEPCO would like in work areas, which has led to the slowing of some efforts.

-Over at No. 3 plant, temperature continues to rise slowly with last report of lower pressure vessel head temperature now at about 151C, up over 30 degrees in a week. TEPCO has now revealed that it altered the flow path for injection water at some point in the past. Temperature has risen slowly over a period of about one month. TEPCO is shifting back to its first injection path for this plant, which it hopes to be using by Thursday. We don't have a piping diagram from TEPCO yet to illustrate the change in flow path.

More details as they're available.

11:00 AM Eastern Tuesday 5/10
ATOMIC POWER REVIEW
Read More
Posted in "fukushima daiichi" "tepco" | No comments

TEPCO: New equipment illustrations

Posted on 05:51 by Unknown
TEPCO has released some new official photographs of equipment specially prepared for use at the Fukushima Daiichi site.

First is a smaller machine, the QinetiQ TALON, along with its remote control unit.


Next is a Bobcat T300 compact track loader. These Bobcats, when fitted with what Bobcat calls its Selectable Joystick Control system, are available from the factory with remote control. Note the cameras fitted to the machine in various locations.

And, here is a link to Bobcat T300 data at Bobcat Company's site.

A small piece of remote controlled construction equipment is shown next; this is the very interesting BROKK 90 in a press photo supplied through TEPCO by the maker of the equipment, TAISEI corporation. Notable are the dual attachments; a pincer type attached to the arm, and a clamshell bucket type. Also of note is the fact that a piece of equipment this size has outriggers for stability, seen deployed in this illustration.

The Brokk 90 is an electro-hydraulic unit, incorporating an 11 KW electric motor to drive hydraulics that operate the rest of the machine. See details here.

Also shown is the much larger Taisei BROKK 330, again through TEPCO courtesy TAISEI.

Taisei does not feature the 330 on its site; it appears to have been replaced with the 330D diesel powered model. This Brokk 330 appears to be powered electrically like the smaller Brokk 90 seen previously. This makes sense, given the confined nature of the spaces in which these machines will work.

9:15 AM Eastern Tuesday 5/10
ATOMIC POWER REVIEW
Read More
Posted in "fukushima daiichi" "tepco" | No comments

Monday, 9 May 2011

High rad levels: Fukushima Daiichi No. 1

Posted on 02:52 by Unknown
As we might have expected, and had read scattered echoes of, there are indeed some quite high radiation levels inside No. 1 reactor building at Fukushima Daiichi. Right now Kyodo is reporting a level of about 70 R/hr which has been detected in one area... where that is exactly, we don't know. With the known fuel damage, rad levels of this caliber are not surprising; surely, portable and temporary shielding will have to be brought in, and rigid stay times enforced. We'll give more data as the work continues in No. 1 and more readings are revealed.

5:55 AM Eastern Monday 5/9
ATOMIC POWER REVIEW
Read More
Posted in "fukushima daiichi" | No comments

Hamaoka will shut down after all

Posted on 02:48 by Unknown
Chubu Electric Company's board has agreed to shut down No. 4 and No. 5 plants at Hamaoka, and to not restart No. 3 which is under inspection. We don't have a time for the shutdown yet.

5:50 AM Eastern Monday 5/9
ATOMIC POWER REVIEW
Read More
Posted in "chubu" "hamaoka" | No comments

Sunday, 8 May 2011

Japan updates: Fukushima Daiichi, Hamaoka

Posted on 01:25 by Unknown
-Chubu Electric intends to hold another board meeting very soon (probably early this week) to decide what to do about Naoto Kan's request to shut down all reactors at Hamaoka.

-TEPCO may enter No. 1 reactor building at Fukushima Daiichi any time now. Once discussions with the government agencies (and that means the national safety entities like NSC and NISA as well as the prefectural government) are complete, TEPCO will send workers into No. 1 building. Until then, let's look at some TEPCO video showing the setup at the pressurized air lock that's been set up. This appears to show both the large Alara Venti units filtering the building air (these are sheathed) and the small units pressurizing the air lock (not sheathed.)


We also have a new video this morning from TEPCO taking a much longer look in the spent fuel pool at No. 4 plant.


4:40 AM Eastern Sunday 5/8
ATOMIC POWER REVIEW
Read More
Posted in "chubu" "hamaoka" "tepco" "fukushima daiichi" | No comments

Friday, 6 May 2011

Chubu Electric / Hamaoka details....

Posted on 12:49 by Unknown
The Japanese Government request to Chubu Electric Power to shut down all reactors at the Hamaoka site results from studies showing that the plant sits above a focal point for what has apparently been a long-predicted earthquake which hasn't happened yet but could hit 8.0 magnitude and could occur within 30 years.

Chubu Electric Power has announced it will agree to the request and shut down the operating plants No. 5 and No. 6 at the site, and not restart No. 3 plant. The earliest two plants at the site are already in the midst of decommissioning.

There is the possibility that, after extensive studies and perhaps plant modifications if required that the three operable reactors at the site could restart. This seems probable, given the Japanese plants' known earthquake resistance. Keep in mind that the Fukushima plants survived an earthquake in excess of that for which they were designed, only to be inundated by the tsunami a short while later.

To our knowledge these are the first plants anywhere to be closed down after the Great East Japan Earthquake simply based on their proximity to known faults, or focal points for earthquake shock, or tsunami threat .. or really any natural disaster threat... without having actually experienced any casualty whatsoever.

3:55 PM Eastern Friday 5/6
ATOMIC POWER REVIEW

UPDATE Saturday 5/7 5:45 AM: Now, NHK is running a story saying the opposite; in other words, that Chubu Electric's board of directors has not yet decided to acquiesce to Naoto Kan's request to shut down the plants. Clearly this situation is fluid (as is the relationship apparently between government, agencies of that government, and utilities) and we'll keep watching to see which way the axe falls.
Read More
Posted in "chubu" "hamaoka" | No comments

Japanese government / Chubu Electric Hamaoka shutdown

Posted on 02:58 by Unknown
At this early hour (at least here in the US) there is a news item running right now only on Kyodo News saying that not only will the Japanese government NOT allow Chubu Electric Power Company to restart Hamaoka No. 3, it will also ask Chubu Electric to shut down Nos. 4 and 5.

We'll post more details later today when they're available.

6:00 AM Eastern Friday 5/6
ATOMIC POWER REVIEW
Read More
Posted in "chubu electric" "hamaoka" | No comments
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Popular Posts

  • Steam Generators: Design and details
    A recent NRC blog post ( see here ) brings up a matter that has come into focus of late at San Onofre Nuclear Generating Station in Californ...
  • The 136th Carnival of Nuclear Bloggers
    I find myself on this December 23rd, making the Atomic Power Review entry hosting the 136th Carnival, thinking about all of the great achiev...
  • Nuclear Icebreakers 101
    An addendum for National Nuclear Science Week - Day 3 In the previous post I gave the briefest overview of the history of the Russian fleet ...
  • San Onofre Nuclear Generating Station Virtual Tour
    Press release from Southern California Edison, courtesy Jennifer Manfre, Senior Manager, Media Relations for SCE. --------------------------...
  • Reactor Pressure Vessels: Metallurgy and Fabrication
    I have received a number of comments on the information I've provided over time on reactor pressure vessels and have also received reque...
  • SCE conducting testing at San Onofre
    There appears to be a growing amount of anti-nuclear press being given to the work processes underway at SCE's San Onofre Nuclear Genera...
  • The 84th Carnival of Nuclear Bloggers
    Once again Atomic Power Review is proud to host the rotating Carnival of Nuclear Bloggers - this, the 84th edition. This feature travels aro...
  • Carnival of Nuclear Bloggers comes to APR
    60th Carnival of Nuclear Bloggers Atomic Power Review is very proud to host, for the first time, the rotating Carnival. This feature present...
  • 60th anniversary of EBR-I power generation
    Yesterday and today mark an important event in nuclear energy history; these two days are the span during which the EBR-1 reactor plant, whi...
  • The effect of big media: A real conversation
    I recently had a conversation with a friend of mine that interestingly turned nuclear. She's married, mother of one beautiful nine month...

Categories

  • " fukushima daiichi"
  • "accident"
  • "alloy"
  • "ameren"
  • "american nuclear society"
  • "annealing"
  • "anniversary"
  • "ans"
  • "anti-nuclear"
  • "AP1000"
  • "arco"
  • "areva"
  • "asn"
  • "associated press" "NRC" "NEI"
  • "atomic journal"
  • "babcock"
  • "blackout"
  • "bloggers"
  • "boron"
  • "brazil"
  • "breeder reactor"
  • "breeder"
  • "browns ferry"
  • "browns ferry" "nine mile point"
  • "BWR"
  • "calhoun"
  • "callaway"
  • "carnival"
  • "chernobyl"
  • "china"
  • "chubu electric" "hamaoka"
  • "chubu" "hamaoka"
  • "chubu" "hamaoka" "tepco" "fukushima daiichi"
  • "chubu" "kyushu" "nisa"
  • "COL"
  • "commissioners"
  • "containment"
  • "contaminated"
  • "cooling"
  • "cooper" "ft calhoun" "flood" "missouri river"
  • "core damage"
  • "criticality"
  • "davis-besse"
  • "delta IV"
  • "dresden" "boiling water reactor" "containment"
  • "dry dock"
  • "dry well"
  • "earth day"
  • "earthquake"
  • "EBR"
  • "ebwr"
  • "education"
  • "elk river"
  • "embrittlement"
  • "enclosure"
  • "energy policy"
  • "equipment"
  • "fabrication"
  • "fermi"
  • "fire"
  • "flood"
  • "frontline"
  • "ft calhoun"
  • "ft calhoun" "oppd" "flood"
  • "ft st vrain"
  • "fukushima daiichi"
  • "fukushima daiichi" "BWR"
  • "fukushima daiichi" "nisa" "tepco"
  • "fukushima daiichi" "tepco"
  • "fukushima daiichi" "tepco" "dry well" "containment" "pressure vessel"
  • "fukushima daiichi" "tepco" "iaea"
  • "fukushima daiichi" "tepco" "kurion" "areva"
  • "fukushima daiichi" "tepco" "nisa"
  • "fukushima daiichi" "tepco" "nisa" "genkai" "pressure vessel"
  • "fukushima daiichi" "tepco" "nisa" "jaif"
  • "fukushima daiichi" "tepco" "nisa" "japan"
  • "fukushima daiichi" "tepco" "nisa" "jsc" "road map" "recovery"
  • "fukushima daiichi" "tepco" "nisa" "spent fuel" "pool"
  • "fukushima daiichi" "tepco" "nitrogen"
  • "fukushima daiichi" "tepco" "robot" "video"
  • "fukushima daiichi" "tepco" "tokai" "japco" "iaea"
  • "fukushima daiichi" "tepco" "tomari" "hokkaido"
  • "fukushima daiichi" "tepco" "tsunami"
  • "fukushima daiichi" "tepco" "video"
  • "fukushima daiichi" "tepco" "video" "youtube"
  • "fukushima daiichi" "TMI" "public opinion" "survey"
  • "fukushima daiichi" "video"
  • "fukushima daiichi" 7 8 plants economic plan TEPCO
  • "fukushima daiichi" cooling water release sea ocean nuclear reactor accident NISA TEPCO pit trench tunnel
  • "fukushima daiichi" nuclear reactor accident contaminated water barge Suzuran Rosatom TEPCO
  • "fukushima daiichi" nuclear reactor accident contaminated water sea radwaste condensers nitrogen hydrogen inert
  • "fukushima daiichi" nuclear reactor accident earthquake onagawa TEPCO tohoku BWR nitrogen
  • "fukushima daiichi" nuclear reactor accident IAEA TEPCO update briefing temperatures pressures
  • "fukushima daiichi" nuclear reactor accident japan update color dye containment fabric update
  • "fukushima daiichi" nuclear reactor accident leakage sea seawater contamination tunnel trench cable pit
  • "fukushima daiichi" nuclear reactor accident liquid glass sodium silicate TEPCO
  • "fukushima daiichi" nuclear reactor accident nitrogen hydrogen inert dry well drywell
  • "fukushima daiichi" nuclear reactor accident nitrogen inert radiolytic radiolysis hydrogen
  • "fukushima daiichi" nuclear reactor accident polymer leak concrete contaminated contamination reactor pressure vessel containment cooling
  • "fukushima daiichi" nuclear reactor accident seawater contamination iodine tunnel trench TEPCO NISA JAIF
  • "fukushima daiichi" nuclear reactor accident site update status project future
  • "fukushima daiichi" nuclear reactor accident sodium silicate liquid glass diagram drawing perspective pipe tunnel trench contamination sea seawater
  • "fukushima daiichi" nuclear reactor accident TEPCO NISA JAIF update
  • "fukushima daiichi" nuclear reactor accident update TEPCO JAIF NISA
  • "fukushima daiichi" nuclear reactor accident water leakage contamination workers found dead
  • "fukushima"
  • "gas cooled"
  • "genkai"
  • "genkai" "embrittlement" "brittle" "pressure vessel"
  • "genkai" "kyushu"
  • "hack job"
  • "hallam"
  • "head"
  • "hearing"
  • "hearings"
  • "higashidori"
  • "hitachi"
  • "HNPF"
  • "hurricane"
  • "hydrogen"
  • "IAEA"
  • "icebreaker"
  • "IFR"
  • "INES"
  • "injection"
  • "irene"
  • "irrelevant"
  • "jaczko"
  • "jaczko" "NRC"
  • "JAIF"
  • "japan"
  • "kurion"
  • "kyushu"
  • "laguna verde"
  • "lenin"
  • "licensing"
  • "loop"
  • "lunch"
  • "marcoule"
  • "mark I"
  • "melt"
  • "meltdown"
  • "mexico"
  • "mitsubishi"
  • "MK I" "containment" "suppression" "youtube" "video"
  • "mPower"
  • "mPower" "Bechtel" "TVA" "babcock"
  • "national nuclear science week"
  • "nei"
  • "new nuclear"
  • "NISA"
  • "nitrogen"
  • "no 5"
  • "no 6"
  • "north anna"
  • "NRC"
  • "NRTS"
  • "nuclear aftershocks"
  • "nuclear energy institute"
  • "nuclear history"
  • "nuclear icebreaker"
  • "office for nuclear regulation"
  • "op-ed"
  • "op-ed" "carnival"
  • "op-ed" "fukushima daiichi"
  • "opinion"
  • "oversight"
  • "palisades"
  • "pbs"
  • "peer review"
  • "poll"
  • "PRA"
  • "press"
  • "pressure vessel"
  • "pressurized thermal shock"
  • "primary to secondary leak"
  • "PTS"
  • "public attitudes"
  • "PWR"
  • "RBMK-1000"
  • "RBMK-1500"
  • "RBMK-2400"
  • "RBMK"
  • "reactor safety"
  • "reading list"
  • "recriticality"
  • "Reid"
  • "reporting"
  • "restart"
  • "risk"
  • "robot"
  • "rod adams" "glenn williams" "interview" "atomic show" "the street"
  • "safety"
  • "san onofre"
  • "sarry"
  • "SBO"
  • "sheldon station"
  • "shippingport"
  • "SMR"
  • "solar"
  • "songs"
  • "south africa"
  • "south texas project"
  • "spent fuel"
  • "SSBN"
  • "steam generator"
  • "steam generators"
  • "steel"
  • "stress tests"
  • "submarine"
  • "support"
  • "Svinicki"
  • "sylcor"
  • "sylvania-corning"
  • "TEPCO"
  • "tepco" "tohoku" "kyushu" "japan"
  • "TMI"
  • "tokyo electric"
  • "Toshiba"
  • "twitter"
  • "UK"
  • "update"
  • "vermont yankee"
  • "vessel"
  • "video"
  • "virgil c summer"
  • "virginia"
  • "vogtle"
  • "wash-1250"
  • "WASH"
  • "westinghouse"
  • "westinghouse" "AP1000" "NRC"
  • "xenon"
  • "youtube"
  • ANO
  • ANS
  • arkansas nuclear one
  • Babcock
  • brittle fracture
  • brookhaven
  • carnival
  • crystal river
  • decommissioning
  • earthquake
  • enriched uranium
  • Entergy
  • fintan dunne
  • FirstEnergy
  • fresno
  • fuel elements
  • fukushima daiichi
  • higashidori
  • hurricane
  • hurricanes
  • industrial accident
  • INES
  • kashiwazaki kariwa TEPCO earthquake
  • kenya
  • license amendment
  • MHI
  • mitsubishi
  • mPower
  • NEI
  • northern fleet
  • nrc
  • nuclear electricity project
  • nuclear history
  • nuclear submarines
  • onagawa tohoku leak earthquake
  • OSHA
  • oyster creek
  • palisades
  • press release
  • pressurized thermal shock
  • PTS
  • retire
  • russian navy
  • san onofre
  • sandy
  • sce
  • sherrell r greene
  • shutdown
  • SMR
  • socal ed
  • songs
  • southern california edison
  • spent fuel
  • spent fuel pool
  • spent fuel pools
  • status
  • steam generator
  • steam generators
  • surry
  • sustainable energy today
  • sylcor
  • sylvania-corning
  • TEPCO
  • tohoku electric power higashidori onagawa LOOP fuel pool cooling
  • tokyo electric power company
  • unusual event

Blog Archive

  • ▼  2013 (71)
    • ▼  October (5)
      • South Korea: Cables fail tests; Government suing ...
      • SCE Requests Arbitration in SONGS Steam Generator ...
      • SCE Demands Mitsubishi Allow Contractually Mandate...
      • Resin-based solution to Fukushima water problems
      • SCE Demands Reimbursement from Mitsubishi for San ...
    • ►  September (5)
    • ►  August (9)
    • ►  July (5)
    • ►  June (6)
    • ►  May (2)
    • ►  April (8)
    • ►  March (13)
    • ►  February (13)
    • ►  January (5)
  • ►  2012 (159)
    • ►  December (6)
    • ►  November (7)
    • ►  October (13)
    • ►  September (7)
    • ►  August (19)
    • ►  July (15)
    • ►  June (16)
    • ►  May (17)
    • ►  April (13)
    • ►  March (14)
    • ►  February (14)
    • ►  January (18)
  • ►  2011 (270)
    • ►  December (22)
    • ►  November (21)
    • ►  October (20)
    • ►  September (21)
    • ►  August (17)
    • ►  July (23)
    • ►  June (24)
    • ►  May (44)
    • ►  April (78)
Powered by Blogger.

About Me

Unknown
View my complete profile