Mitsubishi Tech Support

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Saturday, 17 December 2011

APR - December 17, 2011

Posted on 13:42 by Unknown
Beginning with this post, Atomic Power Review will have a new post format intended to give readers a clear update of events accumulated over several days or a week. This new feature appropriately is called APR (no secret what that stands for) and is intended to be a simple review of events. Detailed posts with specific titles and covering specific events will continue. Fully detailed posts concerning the Fukushima Daiichi accident recovery will continue as well. Readers should also note that the APR Twitter feed (seen in a black background box on the right side of this page) serves as a good quick update news ticker - I often tweet things I do not post here. Further, I would always point readers to the auto-updating blog roll on the right, on which you can see the title of the newest post at a number of highly important nuclear energy blogs.

----------------------------------------

JAPAN UPDATES ... This week, the Japanese Prime Minister announced that the Fukushima Daiichi plant's three damaged reactors had officially reached a state of "cold shutdown." This simply means that the reactors' temperatures overall are under 100C, and that the release of contamination to the environment is controlled (practically halted at No. 1 plant, whose reactor building is fully covered) to limit offsite radiation field exposure health risk to none above normal or background. While many sources are saying that this announcement is simply an arbitrary one designed to make it look as if the recovery is progressing faster than it is, the fact is that this step was actually announced in the recovery road map at the beginning as an important one and, now that it has been reached, or in other words the conditions to declare it satisfied, it's been announced and simply means the things I have described. The brief take on this is that the damaged cores are considered reliably cooled and that radiation exposure off site is negligible. It does not mean that all of a sudden a vast improvement has been achieved and should not be taken as an implication of this.

TEPCO has announced that it may take up to 40 years to fully decommission the plants. This writer recalls that two competing consortiums were working to win a contract bid on the decommissioning, and that the going estimate at that time (some months back) was approximately 30 years. That figure was also used again in the Japanese press recently, but now it appears that at least informally TEPCO is beginning to push the estimate out a bit.

Site operations at Fukushima Daiichi continue as before, very largely. TEPCO has experienced repeated but small leaks on its water cleanup equipment, prompting a stern warning from NISA and causing NISA to require TEPCO to essentially recertify its equipment and procedures. Readers may recall a prior APR post where I mentioned a discussion Dan Yurman and I had about the plant.. and you can be sure TEPCO will be patrolling the equipment in entirety on foot more often than every 20 to 24 hours, which we both agreed was just totally inadequate.

TEPCO has made the observation that it is experiencing a fairly recent net intake of 200 to 500 tons per day of ground water into the plant buildings, and that this is adding to the total accumulation of water that must be processed and stored.

UNITED STATES.... Perhaps the most encouraging news anywhere on the nuclear front is the report this week carried by a number of media and blogs that the Westinghouse APR1000 plant now has a majority of favorable votes in the Nuclear Regulatory Commission and that licensing for these plants is probably imminent. Two plants are actually under construction now at Plant Vogtle, Georgia (at least the foundation work is underway.) Combined construction and operating licenses for the two Vogtle plants, and two to be built at Virgil C. Summer station in South Carolina, may be issued by the end of the year after the full Commission vote.

Vastly more prominent in the news this week, unsurprisingly, was the House Oversight Committee hearing which included investigation into the letter sent to the White House Chief of Staff by all four NRC Commissioners, accusing NRC Chairman Gregory Jaczko of quite a number of inappropriate behaviors that essentially (if true) amount to harassment and development of a hostile work environment. Certain allegations were also made that imply Jaczko's behavior may be worse toward women, and the behavior was said to extend not just to the four Commissioners but to senior NRC staff as well. He was also accused of withholding and/or controlling information provided to the Commissioners. Those are essentially the accusations; I have an opinion piece about this posted on this site which you can read by clicking here.

That debacle briefly behind, Jaczko is now in Japan and will visit the Fukushima Daiichi site. Jaczko was quoted on NHK TV as saying that the achievement of cold shutdown status is a milestone.

OPINION.... This writer feels that the action being taken by certain Republican members of the House of Representatives (read about it here) is probably a very good idea. The allegations made by the four Commissioners (Svinicki, Ostendorff, Apostalakis and Magwood) against Chairman Jaczko are serious and constitute abuse of power if true. Jaczko showed no remorse and admitted no wrongdoing, which makes it only clearer that his attitude is one of complete rigidity. Further, it was practically proven during the questioning that Jaczko thinks he is better suited to judge on safety issues than the other members. These however aren't the most troubling issues.

After the Fukushima Daiichi accident, Jaczko assumed emergency executive power over the NRC - a fact that some Commissioners claim not to have known about until some time after he did so. This essentially removes the commission vote format and makes the Chairman essentially President/Chairman/CEO of the NRC. The problem with this is that the operating regulations state pretty clearly that this is to be done only when the emergency taking place is at a facility that the NRC regulates. NRC doesn't regulate anything in Japan; NISA does. So why did Jaczko assume power? It's a good question, and so good that the legal counsel for the NRC couldn't answer it directly in the afternoon Oversight Committee hearing. Frankly, this writer thought that the counsel's answer was garbage and probably legally unsupportable given the letter of the rule covering executive control of the NRC.

Because there may be some wiggle room or ambiguity, several House members have decided to float around a bill to limit the NRC Chairman's position to just that - and not autocratic overlord. We can only hope, given an increasing amount of data on what might be an agenda for Jaczko, that this bill or else a rewriting of the 1980 act that directs the NRC's management scheme will be enacted.

OTHER NEWS AND NOTES.

Atomic Power Review is proud to have been added to the link list at AREVA North America's fine blog, found by clicking here. We've naturally reciprocated the link. Since this site is a manufacturer (reactor vendor and a lot more, actually) site the blog posts vary widely in their scope but they can't be beaten for direct, accurate information "straight from the horse's mouth" as it were.

Another interesting site I myself just found this week is Nuclear Australia. I will be contacting the owner for link exchange. This blog doesn't update as frequently as some, but the posts are very interesting- the most recent as of now concerning coal plants' radiation emission is noteworthy.

In relation to the aforementioned AP1000 plant.. Westinghouse has, just this week, opened a new part of their website devoted to demonstrating the AP1000's capabilities in the face of a Station Blackout, or SBO event. This new visually stimulating presentation can be found by clicking here. Were anyone to have questions about whether or not real thought has been put into long-term SBO conditions, these presentations answer them.

Finally, a note on video: The full House Oversight Committee hearing with Chairman Jaczko and the other four NRC Commissioners is listed as a 'favorite' at the APR YouTube Channel.

5:50 PM Eastern Saturday December 17, 2011
ATOMIC POWER REVIEW © Will Davis
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Nitrogen inerting drywells..
    Apparently the nitrogen injection to the drywell on No. 1 plant continues... and TEPCO has made a fairly revealing press release which inclu...
  • NuSource LLC - Press Release
    Press release on formation of NuSource LLC follows. MPR & Gavial Form Joint Venture, NuSource LLC, to Address Nuclear Industry Obsolesce...
  • Atomic History: Dresden-1
    In one of our previous discussions concerning the nature of reactor plant containment, we made considerable effort to detail the very early ...
  • Nuclear Icebreakers 101
    An addendum for National Nuclear Science Week - Day 3 In the previous post I gave the briefest overview of the history of the Russian fleet ...
  • Steam Generators: Design and details
    A recent NRC blog post ( see here ) brings up a matter that has come into focus of late at San Onofre Nuclear Generating Station in Californ...
  • San Onofre seismic study - Press release 4/27
    Press release below from SoCal Ed. Some very interesting news about a cooperative project to further investigate the seismic environment at...
  • San Onofre - Notification of Unusual Event 8/26
    Roughly half an hour ago, SCE (Southern California Edison) reported by Twitter that operators at the shut down San Onofre Nuclear Generating...
  • Well done article on Spent Fuel Storage
    Here is a link to an article worth reading. "Spent Nuclear Fuel Rests in Peace near Ft. St. Vrain." This article appeared in the N...
  • LNT Petition for US Citizens to Sign
    Friends, a new petition has been placed on the White House petition website, whose intended purpose is to raise awareness of how damaging th...
  • Carnival 81 on line now
    Dan Yurman has posted the 81st Carnival of Nuclear Bloggers over at his fine blog, "Idaho Samizdat." APR's post on the Decembe...

Categories

  • " fukushima daiichi"
  • "accident"
  • "alloy"
  • "ameren"
  • "american nuclear society"
  • "annealing"
  • "anniversary"
  • "ans"
  • "anti-nuclear"
  • "AP1000"
  • "arco"
  • "areva"
  • "asn"
  • "associated press" "NRC" "NEI"
  • "atomic journal"
  • "babcock"
  • "blackout"
  • "bloggers"
  • "boron"
  • "brazil"
  • "breeder reactor"
  • "breeder"
  • "browns ferry"
  • "browns ferry" "nine mile point"
  • "BWR"
  • "calhoun"
  • "callaway"
  • "carnival"
  • "chernobyl"
  • "china"
  • "chubu electric" "hamaoka"
  • "chubu" "hamaoka"
  • "chubu" "hamaoka" "tepco" "fukushima daiichi"
  • "chubu" "kyushu" "nisa"
  • "COL"
  • "commissioners"
  • "containment"
  • "contaminated"
  • "cooling"
  • "cooper" "ft calhoun" "flood" "missouri river"
  • "core damage"
  • "criticality"
  • "davis-besse"
  • "delta IV"
  • "dresden" "boiling water reactor" "containment"
  • "dry dock"
  • "dry well"
  • "earth day"
  • "earthquake"
  • "EBR"
  • "ebwr"
  • "education"
  • "elk river"
  • "embrittlement"
  • "enclosure"
  • "energy policy"
  • "equipment"
  • "fabrication"
  • "fermi"
  • "fire"
  • "flood"
  • "frontline"
  • "ft calhoun"
  • "ft calhoun" "oppd" "flood"
  • "ft st vrain"
  • "fukushima daiichi"
  • "fukushima daiichi" "BWR"
  • "fukushima daiichi" "nisa" "tepco"
  • "fukushima daiichi" "tepco"
  • "fukushima daiichi" "tepco" "dry well" "containment" "pressure vessel"
  • "fukushima daiichi" "tepco" "iaea"
  • "fukushima daiichi" "tepco" "kurion" "areva"
  • "fukushima daiichi" "tepco" "nisa"
  • "fukushima daiichi" "tepco" "nisa" "genkai" "pressure vessel"
  • "fukushima daiichi" "tepco" "nisa" "jaif"
  • "fukushima daiichi" "tepco" "nisa" "japan"
  • "fukushima daiichi" "tepco" "nisa" "jsc" "road map" "recovery"
  • "fukushima daiichi" "tepco" "nisa" "spent fuel" "pool"
  • "fukushima daiichi" "tepco" "nitrogen"
  • "fukushima daiichi" "tepco" "robot" "video"
  • "fukushima daiichi" "tepco" "tokai" "japco" "iaea"
  • "fukushima daiichi" "tepco" "tomari" "hokkaido"
  • "fukushima daiichi" "tepco" "tsunami"
  • "fukushima daiichi" "tepco" "video"
  • "fukushima daiichi" "tepco" "video" "youtube"
  • "fukushima daiichi" "TMI" "public opinion" "survey"
  • "fukushima daiichi" "video"
  • "fukushima daiichi" 7 8 plants economic plan TEPCO
  • "fukushima daiichi" cooling water release sea ocean nuclear reactor accident NISA TEPCO pit trench tunnel
  • "fukushima daiichi" nuclear reactor accident contaminated water barge Suzuran Rosatom TEPCO
  • "fukushima daiichi" nuclear reactor accident contaminated water sea radwaste condensers nitrogen hydrogen inert
  • "fukushima daiichi" nuclear reactor accident earthquake onagawa TEPCO tohoku BWR nitrogen
  • "fukushima daiichi" nuclear reactor accident IAEA TEPCO update briefing temperatures pressures
  • "fukushima daiichi" nuclear reactor accident japan update color dye containment fabric update
  • "fukushima daiichi" nuclear reactor accident leakage sea seawater contamination tunnel trench cable pit
  • "fukushima daiichi" nuclear reactor accident liquid glass sodium silicate TEPCO
  • "fukushima daiichi" nuclear reactor accident nitrogen hydrogen inert dry well drywell
  • "fukushima daiichi" nuclear reactor accident nitrogen inert radiolytic radiolysis hydrogen
  • "fukushima daiichi" nuclear reactor accident polymer leak concrete contaminated contamination reactor pressure vessel containment cooling
  • "fukushima daiichi" nuclear reactor accident seawater contamination iodine tunnel trench TEPCO NISA JAIF
  • "fukushima daiichi" nuclear reactor accident site update status project future
  • "fukushima daiichi" nuclear reactor accident sodium silicate liquid glass diagram drawing perspective pipe tunnel trench contamination sea seawater
  • "fukushima daiichi" nuclear reactor accident TEPCO NISA JAIF update
  • "fukushima daiichi" nuclear reactor accident update TEPCO JAIF NISA
  • "fukushima daiichi" nuclear reactor accident water leakage contamination workers found dead
  • "fukushima"
  • "gas cooled"
  • "genkai"
  • "genkai" "embrittlement" "brittle" "pressure vessel"
  • "genkai" "kyushu"
  • "hack job"
  • "hallam"
  • "head"
  • "hearing"
  • "hearings"
  • "higashidori"
  • "hitachi"
  • "HNPF"
  • "hurricane"
  • "hydrogen"
  • "IAEA"
  • "icebreaker"
  • "IFR"
  • "INES"
  • "injection"
  • "irene"
  • "irrelevant"
  • "jaczko"
  • "jaczko" "NRC"
  • "JAIF"
  • "japan"
  • "kurion"
  • "kyushu"
  • "laguna verde"
  • "lenin"
  • "licensing"
  • "loop"
  • "lunch"
  • "marcoule"
  • "mark I"
  • "melt"
  • "meltdown"
  • "mexico"
  • "mitsubishi"
  • "MK I" "containment" "suppression" "youtube" "video"
  • "mPower"
  • "mPower" "Bechtel" "TVA" "babcock"
  • "national nuclear science week"
  • "nei"
  • "new nuclear"
  • "NISA"
  • "nitrogen"
  • "no 5"
  • "no 6"
  • "north anna"
  • "NRC"
  • "NRTS"
  • "nuclear aftershocks"
  • "nuclear energy institute"
  • "nuclear history"
  • "nuclear icebreaker"
  • "office for nuclear regulation"
  • "op-ed"
  • "op-ed" "carnival"
  • "op-ed" "fukushima daiichi"
  • "opinion"
  • "oversight"
  • "palisades"
  • "pbs"
  • "peer review"
  • "poll"
  • "PRA"
  • "press"
  • "pressure vessel"
  • "pressurized thermal shock"
  • "primary to secondary leak"
  • "PTS"
  • "public attitudes"
  • "PWR"
  • "RBMK-1000"
  • "RBMK-1500"
  • "RBMK-2400"
  • "RBMK"
  • "reactor safety"
  • "reading list"
  • "recriticality"
  • "Reid"
  • "reporting"
  • "restart"
  • "risk"
  • "robot"
  • "rod adams" "glenn williams" "interview" "atomic show" "the street"
  • "safety"
  • "san onofre"
  • "sarry"
  • "SBO"
  • "sheldon station"
  • "shippingport"
  • "SMR"
  • "solar"
  • "songs"
  • "south africa"
  • "south texas project"
  • "spent fuel"
  • "SSBN"
  • "steam generator"
  • "steam generators"
  • "steel"
  • "stress tests"
  • "submarine"
  • "support"
  • "Svinicki"
  • "sylcor"
  • "sylvania-corning"
  • "TEPCO"
  • "tepco" "tohoku" "kyushu" "japan"
  • "TMI"
  • "tokyo electric"
  • "Toshiba"
  • "twitter"
  • "UK"
  • "update"
  • "vermont yankee"
  • "vessel"
  • "video"
  • "virgil c summer"
  • "virginia"
  • "vogtle"
  • "wash-1250"
  • "WASH"
  • "westinghouse"
  • "westinghouse" "AP1000" "NRC"
  • "xenon"
  • "youtube"
  • ANO
  • ANS
  • arkansas nuclear one
  • Babcock
  • brittle fracture
  • brookhaven
  • carnival
  • crystal river
  • decommissioning
  • earthquake
  • enriched uranium
  • Entergy
  • fintan dunne
  • FirstEnergy
  • fresno
  • fuel elements
  • fukushima daiichi
  • higashidori
  • hurricane
  • hurricanes
  • industrial accident
  • INES
  • kashiwazaki kariwa TEPCO earthquake
  • kenya
  • license amendment
  • MHI
  • mitsubishi
  • mPower
  • NEI
  • northern fleet
  • nrc
  • nuclear electricity project
  • nuclear history
  • nuclear submarines
  • onagawa tohoku leak earthquake
  • OSHA
  • oyster creek
  • palisades
  • press release
  • pressurized thermal shock
  • PTS
  • retire
  • russian navy
  • san onofre
  • sandy
  • sce
  • sherrell r greene
  • shutdown
  • SMR
  • socal ed
  • songs
  • southern california edison
  • spent fuel
  • spent fuel pool
  • spent fuel pools
  • status
  • steam generator
  • steam generators
  • surry
  • sustainable energy today
  • sylcor
  • sylvania-corning
  • TEPCO
  • tohoku electric power higashidori onagawa LOOP fuel pool cooling
  • tokyo electric power company
  • unusual event

Blog Archive

  • ►  2013 (71)
    • ►  October (5)
    • ►  September (5)
    • ►  August (9)
    • ►  July (5)
    • ►  June (6)
    • ►  May (2)
    • ►  April (8)
    • ►  March (13)
    • ►  February (13)
    • ►  January (5)
  • ►  2012 (159)
    • ►  December (6)
    • ►  November (7)
    • ►  October (13)
    • ►  September (7)
    • ►  August (19)
    • ►  July (15)
    • ►  June (16)
    • ►  May (17)
    • ►  April (13)
    • ►  March (14)
    • ►  February (14)
    • ►  January (18)
  • ▼  2011 (270)
    • ▼  December (22)
      • Russian Delta IV class submarine fire
      • Fukushima / TEPCO update for December 28, 2011
      • Fukushima Daiichi - brief update
      • The 84th Carnival of Nuclear Bloggers
      • Westinghouse AP1000 certified
      • National Nuclear Science Week - this time, next mo...
      • 60th anniversary of EBR-I power generation
      • Radiation deaths in US due to Fukushima Daiichi: ...
      • "Cold Shutdown" controversy at Fukushima Daiichi
      • Carnival 83 up at ANS Nuclear Cafe
      • APR - December 17, 2011
      • House Oversight Committee / NRC hearing, Dec. 14
      • Update to core cooling information at Fukushima Da...
      • Fukushima Daiichi update - December 13, 2011
      • Radioactive Emissions Measurement at Fukushima Dai...
      • AP1000 SBO information
      • The situation at the NRC
      • Carnival 82 online now... and it's a special one!
      • Will's winter reading list
      • Process water leakage at Fukushima Daiichi, and po...
      • Carnival 81 on line now
      • December 2, 2011 - An anniversary piece.
    • ►  November (21)
    • ►  October (20)
    • ►  September (21)
    • ►  August (17)
    • ►  July (23)
    • ►  June (24)
    • ►  May (44)
    • ►  April (78)
Powered by Blogger.

About Me

Unknown
View my complete profile