Mitsubishi Tech Support

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Friday, 15 June 2012

Water Hammer - guest post by A. David Rossin

Posted on 15:20 by Unknown
Background: A number of us have been discussing, for some months now, the chance that some of the water leakage at the Fukushima Daiichi plants which experienced the meltdowns might be completely external to the reactor vessels, and might be due to the deleterious effects of water hammer (sometimes in the old days known as 'steam hammer' under variable conditions.) This happens when a dead end of pipe, or piping with a restriction or perhaps a check valve is suddenly pressurized; water, being for all practical purposes totally incompressible, can cause serious damage when it is propelled suddenly with high velocity to the end of a piping run which effectively is dead headed. It has been postulated that this kind of effect, perhaps in conjunction with thermal shock (the operators did have to resort to the use of any water volume available, including sea water) could have resulted in leakage that detracted from flow that should have been cooling reactor fuel at any or all of the three plants that experienced core melting. While this is merely conjecture, I will add that is is sensible and informed conjecture - but also conjecture that can't be proven until TEPCO can get far deeper into the plants than it is now.

What follows is a very interesting reflection on this phenomenon by A. David Rossin. "Dave" Rossin has become one of my e-mail acquaintances (who I cannot wait to meet in person) through the American Nuclear Society; Dave is in fact a past ANS President. His experience is incredible and quite varied, and a proper bio would be a half hour or hour long TV documentary. I'm proud to present his piece below in entirety and unedited.

--------------------

Water Hammer – Steam Hammer

A. David Rossin 6-10-12

A couple of years after I started work at Argonne in 1955 I was assigned to the ALPR project. This was the small 3 Mw thermal BWR which was designed to be for a remote Alaskan DEW Line outpost. It was later renamed SL-1. Remember?

I was “Assistant Reactor Physicist.” After we had run it for a couple of months, we scheduled a set of tests to verify its safety and to test the performance of some safety systems. The ALPR had a spray ring inside the vessel above the top of the core. Its purpose was to provide emergency cooling water to cool the core if it was necessary to quench the steam, depressurize the vessel and flood the core. In some ways it was the forerunner of the HPCI, the high-pressure injection system of the first BWR’s.

I was in the control room, which was separated from the reactor building by a gap, some steel and12 feet of rock and sand shielding.

The plan was for the operator was to SCRAM the reactor, slow down and then cut off the recirc pump, let boiling subside, and then activate the emergency spray cooling system.

Several seconds after the pump was turned on the banging started. The noise level was terrible! The control room shook violently, and we figured that the reactor and its structure did too. The emergency pump was cut off ASAP. The heaviest banging soon stopped but a lower level of noises kept up for a while.

I recall that an “older” engineer (he must have been 53 or 54) announced that it must have been “steam hammer.” He told some of his boiler stories, and we all recalled visits to our parents or grandparents’ apartments in the winter when the radiators had gone on and there were couple of minutes of steam hammer before things settled down and they got hot. Heavy cast-iron radiators seemed to sit just below windowsills.

“Steam Hammer”, “Water Hammer” - the two names were both used.

What was obvious was that when water was injected by the emergency pump into the spray ring, the ring pipe was plenty hot, and before high-pressure water flow could be established into the ring and out the many holes, water would flash to steam at many places and the banging was the result. Much later, when the ring itself was examined, damage was found on the supports that held the ring onto the inside wall of the pressure vessel. But as I faintly recall, the ring itself, though kind of discolored, was pretty much as it had been dimensionally. No new cracks or bends.

We decided that the emergency cooling function had to be re-evaluated. Meanwhile the reactor would only be operated at very low power for physics measurements and training purposes.

I went back to Chicago and was assigned to work with Bernie Spinrad as his Reactor Physics Division Assistant Director, Monthly Report Editor and Errand Boy, etc.

It was a couple of years later, serving on the Argonne Reactor Safety Review Committee that the water hammer issue came up again somewhere else. By then, ALPR had been transferred to Combustion Engineering to operate for the Government and named SL-1. To the best of my knowledge, no operator had tried to operate the emergency core cooling system. I believe it had been locked out. It had nothing to do with the later tragedy that killed three men and ended the life of SL-1.

When I was at Commonwealth Edison after 1972 I visited Dresden and Quad Cities. I talked at length with the plant managers. One of them set up a meeting for me with guys from GE. They explained how they had engineered their HPSI and LPSI systems to avoid steam/water hammer, and provided papers on a couple of test programs. Although the issue was looked at again at NSAC while the Peach Bottom PRA was being done, the guys there found it satisfactory and it did not run high in any of their risks analyses.

Every couple of years I get a dream about water hammer. I think about conditions at the time it is needed being outside the envelope of temperature, pressure and flow conditions for which its operation was designed and tested. I just hope I never wake up to find myself reading about it in the paper the next morning.

--------------------

Thanks to Dave Rossin for this story - which gives our readers here a first person introduction to this phenomenon; we may need this for background as the Fukushima Daiichi investigations continue. Below, from "Boiling Water Reactors" published for the AEC in 1958 (by Andrew W. Kramer), we see the ALPR (later, SL-1) site.



The largest cylindrical structure in the illustration is the reactor building, which housed not only the reactor but the turbine generator as well. The control room was located in the adjacent support building.

6:20 PM Eastern 6/15/2012
ATOMIC POWER REVIEW
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Nitrogen inerting drywells..
    Apparently the nitrogen injection to the drywell on No. 1 plant continues... and TEPCO has made a fairly revealing press release which inclu...
  • NuSource LLC - Press Release
    Press release on formation of NuSource LLC follows. MPR & Gavial Form Joint Venture, NuSource LLC, to Address Nuclear Industry Obsolesce...
  • Atomic History: Dresden-1
    In one of our previous discussions concerning the nature of reactor plant containment, we made considerable effort to detail the very early ...
  • Steam Generators: Design and details
    A recent NRC blog post ( see here ) brings up a matter that has come into focus of late at San Onofre Nuclear Generating Station in Californ...
  • APRA Special: Observations on Fukushima Daiichi.
    People are beginning to look for answers, especially as the Japanese seem prepared to upgrade the INES status at Fukushima Daiichi to a Leve...
  • Wednesday morning update... Fukushima Daiichi
    TEPCO will be increasing the amount of water injected to No. 1 plant incrementally and checking the results, preparatory to filling the prim...
  • Vermont Yankee on the block due to Fukushima Daiichi
    The long-time readers of this blog might recall last year's various comments on the entire Vermont Yankee situation vis a vis licensing ...
  • Nuclear Energy in Japan: July 15 brief update
    -TEPCO has begun nitrogen injection into No. 3 plant's dry well at Fukushima Daiichi. -The Japanese government is now reported as taking...
  • Babcock & Wilcox / Naval Nuclear Power contract
    Press release from Babcock & Wilcox below. -------------------- B&W Announces $130 Million Contract for Naval Nuclear Reactor Compon...
  • 60th anniversary of EBR-I power generation
    Yesterday and today mark an important event in nuclear energy history; these two days are the span during which the EBR-1 reactor plant, whi...

Categories

  • " fukushima daiichi"
  • "accident"
  • "alloy"
  • "ameren"
  • "american nuclear society"
  • "annealing"
  • "anniversary"
  • "ans"
  • "anti-nuclear"
  • "AP1000"
  • "arco"
  • "areva"
  • "asn"
  • "associated press" "NRC" "NEI"
  • "atomic journal"
  • "babcock"
  • "blackout"
  • "bloggers"
  • "boron"
  • "brazil"
  • "breeder reactor"
  • "breeder"
  • "browns ferry"
  • "browns ferry" "nine mile point"
  • "BWR"
  • "calhoun"
  • "callaway"
  • "carnival"
  • "chernobyl"
  • "china"
  • "chubu electric" "hamaoka"
  • "chubu" "hamaoka"
  • "chubu" "hamaoka" "tepco" "fukushima daiichi"
  • "chubu" "kyushu" "nisa"
  • "COL"
  • "commissioners"
  • "containment"
  • "contaminated"
  • "cooling"
  • "cooper" "ft calhoun" "flood" "missouri river"
  • "core damage"
  • "criticality"
  • "davis-besse"
  • "delta IV"
  • "dresden" "boiling water reactor" "containment"
  • "dry dock"
  • "dry well"
  • "earth day"
  • "earthquake"
  • "EBR"
  • "ebwr"
  • "education"
  • "elk river"
  • "embrittlement"
  • "enclosure"
  • "energy policy"
  • "equipment"
  • "fabrication"
  • "fermi"
  • "fire"
  • "flood"
  • "frontline"
  • "ft calhoun"
  • "ft calhoun" "oppd" "flood"
  • "ft st vrain"
  • "fukushima daiichi"
  • "fukushima daiichi" "BWR"
  • "fukushima daiichi" "nisa" "tepco"
  • "fukushima daiichi" "tepco"
  • "fukushima daiichi" "tepco" "dry well" "containment" "pressure vessel"
  • "fukushima daiichi" "tepco" "iaea"
  • "fukushima daiichi" "tepco" "kurion" "areva"
  • "fukushima daiichi" "tepco" "nisa"
  • "fukushima daiichi" "tepco" "nisa" "genkai" "pressure vessel"
  • "fukushima daiichi" "tepco" "nisa" "jaif"
  • "fukushima daiichi" "tepco" "nisa" "japan"
  • "fukushima daiichi" "tepco" "nisa" "jsc" "road map" "recovery"
  • "fukushima daiichi" "tepco" "nisa" "spent fuel" "pool"
  • "fukushima daiichi" "tepco" "nitrogen"
  • "fukushima daiichi" "tepco" "robot" "video"
  • "fukushima daiichi" "tepco" "tokai" "japco" "iaea"
  • "fukushima daiichi" "tepco" "tomari" "hokkaido"
  • "fukushima daiichi" "tepco" "tsunami"
  • "fukushima daiichi" "tepco" "video"
  • "fukushima daiichi" "tepco" "video" "youtube"
  • "fukushima daiichi" "TMI" "public opinion" "survey"
  • "fukushima daiichi" "video"
  • "fukushima daiichi" 7 8 plants economic plan TEPCO
  • "fukushima daiichi" cooling water release sea ocean nuclear reactor accident NISA TEPCO pit trench tunnel
  • "fukushima daiichi" nuclear reactor accident contaminated water barge Suzuran Rosatom TEPCO
  • "fukushima daiichi" nuclear reactor accident contaminated water sea radwaste condensers nitrogen hydrogen inert
  • "fukushima daiichi" nuclear reactor accident earthquake onagawa TEPCO tohoku BWR nitrogen
  • "fukushima daiichi" nuclear reactor accident IAEA TEPCO update briefing temperatures pressures
  • "fukushima daiichi" nuclear reactor accident japan update color dye containment fabric update
  • "fukushima daiichi" nuclear reactor accident leakage sea seawater contamination tunnel trench cable pit
  • "fukushima daiichi" nuclear reactor accident liquid glass sodium silicate TEPCO
  • "fukushima daiichi" nuclear reactor accident nitrogen hydrogen inert dry well drywell
  • "fukushima daiichi" nuclear reactor accident nitrogen inert radiolytic radiolysis hydrogen
  • "fukushima daiichi" nuclear reactor accident polymer leak concrete contaminated contamination reactor pressure vessel containment cooling
  • "fukushima daiichi" nuclear reactor accident seawater contamination iodine tunnel trench TEPCO NISA JAIF
  • "fukushima daiichi" nuclear reactor accident site update status project future
  • "fukushima daiichi" nuclear reactor accident sodium silicate liquid glass diagram drawing perspective pipe tunnel trench contamination sea seawater
  • "fukushima daiichi" nuclear reactor accident TEPCO NISA JAIF update
  • "fukushima daiichi" nuclear reactor accident update TEPCO JAIF NISA
  • "fukushima daiichi" nuclear reactor accident water leakage contamination workers found dead
  • "fukushima"
  • "gas cooled"
  • "genkai"
  • "genkai" "embrittlement" "brittle" "pressure vessel"
  • "genkai" "kyushu"
  • "hack job"
  • "hallam"
  • "head"
  • "hearing"
  • "hearings"
  • "higashidori"
  • "hitachi"
  • "HNPF"
  • "hurricane"
  • "hydrogen"
  • "IAEA"
  • "icebreaker"
  • "IFR"
  • "INES"
  • "injection"
  • "irene"
  • "irrelevant"
  • "jaczko"
  • "jaczko" "NRC"
  • "JAIF"
  • "japan"
  • "kurion"
  • "kyushu"
  • "laguna verde"
  • "lenin"
  • "licensing"
  • "loop"
  • "lunch"
  • "marcoule"
  • "mark I"
  • "melt"
  • "meltdown"
  • "mexico"
  • "mitsubishi"
  • "MK I" "containment" "suppression" "youtube" "video"
  • "mPower"
  • "mPower" "Bechtel" "TVA" "babcock"
  • "national nuclear science week"
  • "nei"
  • "new nuclear"
  • "NISA"
  • "nitrogen"
  • "no 5"
  • "no 6"
  • "north anna"
  • "NRC"
  • "NRTS"
  • "nuclear aftershocks"
  • "nuclear energy institute"
  • "nuclear history"
  • "nuclear icebreaker"
  • "office for nuclear regulation"
  • "op-ed"
  • "op-ed" "carnival"
  • "op-ed" "fukushima daiichi"
  • "opinion"
  • "oversight"
  • "palisades"
  • "pbs"
  • "peer review"
  • "poll"
  • "PRA"
  • "press"
  • "pressure vessel"
  • "pressurized thermal shock"
  • "primary to secondary leak"
  • "PTS"
  • "public attitudes"
  • "PWR"
  • "RBMK-1000"
  • "RBMK-1500"
  • "RBMK-2400"
  • "RBMK"
  • "reactor safety"
  • "reading list"
  • "recriticality"
  • "Reid"
  • "reporting"
  • "restart"
  • "risk"
  • "robot"
  • "rod adams" "glenn williams" "interview" "atomic show" "the street"
  • "safety"
  • "san onofre"
  • "sarry"
  • "SBO"
  • "sheldon station"
  • "shippingport"
  • "SMR"
  • "solar"
  • "songs"
  • "south africa"
  • "south texas project"
  • "spent fuel"
  • "SSBN"
  • "steam generator"
  • "steam generators"
  • "steel"
  • "stress tests"
  • "submarine"
  • "support"
  • "Svinicki"
  • "sylcor"
  • "sylvania-corning"
  • "TEPCO"
  • "tepco" "tohoku" "kyushu" "japan"
  • "TMI"
  • "tokyo electric"
  • "Toshiba"
  • "twitter"
  • "UK"
  • "update"
  • "vermont yankee"
  • "vessel"
  • "video"
  • "virgil c summer"
  • "virginia"
  • "vogtle"
  • "wash-1250"
  • "WASH"
  • "westinghouse"
  • "westinghouse" "AP1000" "NRC"
  • "xenon"
  • "youtube"
  • ANO
  • ANS
  • arkansas nuclear one
  • Babcock
  • brittle fracture
  • brookhaven
  • carnival
  • crystal river
  • decommissioning
  • earthquake
  • enriched uranium
  • Entergy
  • fintan dunne
  • FirstEnergy
  • fresno
  • fuel elements
  • fukushima daiichi
  • higashidori
  • hurricane
  • hurricanes
  • industrial accident
  • INES
  • kashiwazaki kariwa TEPCO earthquake
  • kenya
  • license amendment
  • MHI
  • mitsubishi
  • mPower
  • NEI
  • northern fleet
  • nrc
  • nuclear electricity project
  • nuclear history
  • nuclear submarines
  • onagawa tohoku leak earthquake
  • OSHA
  • oyster creek
  • palisades
  • press release
  • pressurized thermal shock
  • PTS
  • retire
  • russian navy
  • san onofre
  • sandy
  • sce
  • sherrell r greene
  • shutdown
  • SMR
  • socal ed
  • songs
  • southern california edison
  • spent fuel
  • spent fuel pool
  • spent fuel pools
  • status
  • steam generator
  • steam generators
  • surry
  • sustainable energy today
  • sylcor
  • sylvania-corning
  • TEPCO
  • tohoku electric power higashidori onagawa LOOP fuel pool cooling
  • tokyo electric power company
  • unusual event

Blog Archive

  • ►  2013 (71)
    • ►  October (5)
    • ►  September (5)
    • ►  August (9)
    • ►  July (5)
    • ►  June (6)
    • ►  May (2)
    • ►  April (8)
    • ►  March (13)
    • ►  February (13)
    • ►  January (5)
  • ▼  2012 (159)
    • ►  December (6)
    • ►  November (7)
    • ►  October (13)
    • ►  September (7)
    • ►  August (19)
    • ►  July (15)
    • ▼  June (16)
      • Monday at ANS Annual Meeting 2012
      • Sunday at ANS Annual Meeting 2012
      • ANS 2012 - Preliminaries
      • 110th Carnival of Nuclear Bloggers
      • Augmented Inspection Team Meeting at San Onofre (P...
      • Carnival 109 at ANS Nuclear Cafe now
      • Ohi reactor restart in Japan fully approved.
      • Water Hammer - guest post by A. David Rossin
      • Review: "Super-Fuel: Thorium, the Green Energy S...
      • Westinghouse / India - Early Works Agreement (pres...
      • NuStart Energy Development LLC to disband June 30
      • DFRP Concept: A fresh approach to national waste ...
      • Spent Fuel Pool Containment: Guest Post
      • Further, but misguided, action on spent fuel repos...
      • San Onofre 6/7 update from SoCal Ed
      • A fresh life for spent fuel storage?
    • ►  May (17)
    • ►  April (13)
    • ►  March (14)
    • ►  February (14)
    • ►  January (18)
  • ►  2011 (270)
    • ►  December (22)
    • ►  November (21)
    • ►  October (20)
    • ►  September (21)
    • ►  August (17)
    • ►  July (23)
    • ►  June (24)
    • ►  May (44)
    • ►  April (78)
Powered by Blogger.

About Me

Unknown
View my complete profile