We now have a fairly thorough report from TEPCO which details the extent of core damage at Fukushima Daiichi No. 1, and gives some times for certain events on the first several days. This report contains, again, some serious information and I will detail it for you as best as possible for a very wide audience. Before going into details, let me first give some of the most important revelations and analytical impressions off the top.

1. The entire core at No. 1 plant was essentially demolished within 16 hours or so after the scram.

2. Data indicate maintained water level in the core until the time of the arrival of the tsunami.

3. TEPCO feels that the core material is still inside the reactor pressure vessel, albeit all at the bottom resting on the lower pressure vessel head.

4. Analytically, the vast majority of studies and symposiums on BWR plants in a long term SBO situation have been proven correct in their findings. By this I mean the generally assumed time until core damage after loss of battery power, and the plain fact that extended SBO leads to core melt. (SBO = Station Blackout, loss of all AC power and then eventually loss of DC power in the long-term SBO sequence. There is also the chance of short-term SBO, but this is not our focus here.)

TIMELINE OF EVENTS

Unfortunately TEPCO has printed "all rights reserved" on its illustrations in this press release, but we can quote data.

Here from the data available now from TEPCO is a timeline of events at Fukushima Daiichi No. 1 plant, adding in historical data from our filed earlier reports:

MARCH 11 2011
14:46 Earthquake; automatic reactor protection action (full scram.)
15:30 Tsunami hits plant
15:42 Report of loss of all AC power
16:36 Report of inability to inject water to core
18:00 Water level is down to top of the fuel rods
19:30 Water level at bottom of active fuel. Fuel temp rapidly approaching melt point

MARCH 12 2011
01:20 Report of rapid rise in primary containment pressure
05:50 Begin injection of fresh water to core
06:00 All fuel in core is in some state of damage or melt
14:30 Began venting primary containment to atmosphere
14:50 Stop fresh water injection to core
15:36 Hydrogen explosion heavily damages reactor building
20:00 Begin injection of sea water (borated) {one source says 20:20}

TEPCO'S NEW REPORT

TEPCO indicates that even though the core was destroyed about 16 hours after the protective trip (scram) it is still inside the pressure vessel, and has been cooled to some extent by water most of the time. TEPCO also feels that the relatively continuous injection of water has prevented the core from exiting the pressure vessel. At this time, the core is considered adequately cooled to prevent further release, at the very least.

The high temperature seen at the feed nozzle is due to exposed fuel in the core superheating injected cooling water.

TEPCO indicates that damage to the pressure vessel is likely. However, it indicates that damage isn't so severe that the corium could exit. The rationale for this assumption is the grouping of similar temperatures on the lower head and two different parts of the CRDM.

TEPCO also feels that since temperature and pressure in the containment seem to move in step with primary plant changes, there is enough damage to the pressure vessel and/or piping to permit what would appear to be fairly rapid communication between the two. However, TEPCO has backed off from saying that there is a serious large breach of the lower vessel head... instead referring to a number of smaller openings.

Not specifically mentioned, but important... It is also clear that the primary containment is damaged and that injected water has been issuing from the primary system to the containment, and then out of the containment to various locations for a long time.

SOME CONCLUSIONS.

-The occurrence of core damage as predicted in studies and computer modeling is as would be expected.

-The timing of beginning of fresh water injection to the core again on the 12th as stated in one source correlates well with the new TEPCO indication of all the fuel being damaged or melting a half hour or so later. This is because the readmission of water would rapidly damage the already super hot fuel cladding... as surmised in numerous studies covering core re-flood.

-Injection of borated seawater at 20:00 on the 12th was far too late. The first source used should have been borated.

-In order to be really meaningful, we need both many more data points than the times and events given above, and reasons for each. For example, what was the reason that fresh water injection was stopped at 14:50 on the 12th? Did the injection system fail? Did the site run out of fresh water? We can go on, but it must be stressed that we cannot read TOO much into the timeline given above. It is only a first working model.

As we now see, the previous BWR conclusions done in many years' worth of studies have proven essentially correct. Not that anyone thought that they would not; no one figured that the event would actually occur (long-term SBO) because of sufficient backup power. The tsunami (the true accident-triggering event, even with the latest data) was the real death blow to the TEPCO efforts on site. After the tsunami forced the plant into the true long-term SBO event sequence, it does now appear that plant behavior even with the best possible TEPCO operator action followed the expected curve and resulted in a complete core melt.

What is fortunate is that it appears as if the ongoing efforts at the site during that time ensured that the core debris (corium) remained in the pressure vessel, even though the vessel was damaged. It now appears that with the core totally destroyed, that the metal-water reaction generated hydrogen, coupled with likely added hydrogen from radiolysis and perhaps even methane (as mentioned twice or more on this blog previously) would have been enough to destroy the reactor building when ignited.

We will be watching very closely for further updates and particularly for estimation of the damage to the vessel and primary containment. We will be issuing some further illustrations in updates coming shortly.

4:00 PM Eastern Sunday 5/15
ATOMIC POWER REVIEW
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Posted in "fukushima daiichi" "tepco" | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Nitrogen inerting drywells..
    Apparently the nitrogen injection to the drywell on No. 1 plant continues... and TEPCO has made a fairly revealing press release which inclu...
  • NuSource LLC - Press Release
    Press release on formation of NuSource LLC follows. MPR & Gavial Form Joint Venture, NuSource LLC, to Address Nuclear Industry Obsolesce...
  • Nuclear Icebreakers 101
    An addendum for National Nuclear Science Week - Day 3 In the previous post I gave the briefest overview of the history of the Russian fleet ...
  • Davis-Besse vessel head replacement
    As reported on the NRC blog, Davis-Besse has been shut down for replacement of its pressure vessel head. This plant is a Babcock & Wilco...
  • Atomic History: Dresden-1
    In one of our previous discussions concerning the nature of reactor plant containment, we made considerable effort to detail the very early ...
  • Carnival 81 on line now
    Dan Yurman has posted the 81st Carnival of Nuclear Bloggers over at his fine blog, "Idaho Samizdat." APR's post on the Decembe...
  • San Onofre seismic study - Press release 4/27
    Press release below from SoCal Ed. Some very interesting news about a cooperative project to further investigate the seismic environment at...
  • An interesting week, to say the least.
    This has indeed been an interesting week for those who follow the news in nuclear energy. Here is a brief recap from my perspective. NRC CH...
  • Hurricane Irene approaching Eastern U.S.
    Probably no one at this point could do better than Brian Wheeler did at POWER ENGINEERING with the following article (link below) concerning...
  • Brief Fukushima Daiichi update- Sunday 5/22
    As reported on this blog on April 23, TEPCO has (again) noted the discovery of radioactive debris on the Fukushima Daiichi site which is emi...

Categories

  • " fukushima daiichi"
  • "accident"
  • "alloy"
  • "ameren"
  • "american nuclear society"
  • "annealing"
  • "anniversary"
  • "ans"
  • "anti-nuclear"
  • "AP1000"
  • "arco"
  • "areva"
  • "asn"
  • "associated press" "NRC" "NEI"
  • "atomic journal"
  • "babcock"
  • "blackout"
  • "bloggers"
  • "boron"
  • "brazil"
  • "breeder reactor"
  • "breeder"
  • "browns ferry"
  • "browns ferry" "nine mile point"
  • "BWR"
  • "calhoun"
  • "callaway"
  • "carnival"
  • "chernobyl"
  • "china"
  • "chubu electric" "hamaoka"
  • "chubu" "hamaoka"
  • "chubu" "hamaoka" "tepco" "fukushima daiichi"
  • "chubu" "kyushu" "nisa"
  • "COL"
  • "commissioners"
  • "containment"
  • "contaminated"
  • "cooling"
  • "cooper" "ft calhoun" "flood" "missouri river"
  • "core damage"
  • "criticality"
  • "davis-besse"
  • "delta IV"
  • "dresden" "boiling water reactor" "containment"
  • "dry dock"
  • "dry well"
  • "earth day"
  • "earthquake"
  • "EBR"
  • "ebwr"
  • "education"
  • "elk river"
  • "embrittlement"
  • "enclosure"
  • "energy policy"
  • "equipment"
  • "fabrication"
  • "fermi"
  • "fire"
  • "flood"
  • "frontline"
  • "ft calhoun"
  • "ft calhoun" "oppd" "flood"
  • "ft st vrain"
  • "fukushima daiichi"
  • "fukushima daiichi" "BWR"
  • "fukushima daiichi" "nisa" "tepco"
  • "fukushima daiichi" "tepco"
  • "fukushima daiichi" "tepco" "dry well" "containment" "pressure vessel"
  • "fukushima daiichi" "tepco" "iaea"
  • "fukushima daiichi" "tepco" "kurion" "areva"
  • "fukushima daiichi" "tepco" "nisa"
  • "fukushima daiichi" "tepco" "nisa" "genkai" "pressure vessel"
  • "fukushima daiichi" "tepco" "nisa" "jaif"
  • "fukushima daiichi" "tepco" "nisa" "japan"
  • "fukushima daiichi" "tepco" "nisa" "jsc" "road map" "recovery"
  • "fukushima daiichi" "tepco" "nisa" "spent fuel" "pool"
  • "fukushima daiichi" "tepco" "nitrogen"
  • "fukushima daiichi" "tepco" "robot" "video"
  • "fukushima daiichi" "tepco" "tokai" "japco" "iaea"
  • "fukushima daiichi" "tepco" "tomari" "hokkaido"
  • "fukushima daiichi" "tepco" "tsunami"
  • "fukushima daiichi" "tepco" "video"
  • "fukushima daiichi" "tepco" "video" "youtube"
  • "fukushima daiichi" "TMI" "public opinion" "survey"
  • "fukushima daiichi" "video"
  • "fukushima daiichi" 7 8 plants economic plan TEPCO
  • "fukushima daiichi" cooling water release sea ocean nuclear reactor accident NISA TEPCO pit trench tunnel
  • "fukushima daiichi" nuclear reactor accident contaminated water barge Suzuran Rosatom TEPCO
  • "fukushima daiichi" nuclear reactor accident contaminated water sea radwaste condensers nitrogen hydrogen inert
  • "fukushima daiichi" nuclear reactor accident earthquake onagawa TEPCO tohoku BWR nitrogen
  • "fukushima daiichi" nuclear reactor accident IAEA TEPCO update briefing temperatures pressures
  • "fukushima daiichi" nuclear reactor accident japan update color dye containment fabric update
  • "fukushima daiichi" nuclear reactor accident leakage sea seawater contamination tunnel trench cable pit
  • "fukushima daiichi" nuclear reactor accident liquid glass sodium silicate TEPCO
  • "fukushima daiichi" nuclear reactor accident nitrogen hydrogen inert dry well drywell
  • "fukushima daiichi" nuclear reactor accident nitrogen inert radiolytic radiolysis hydrogen
  • "fukushima daiichi" nuclear reactor accident polymer leak concrete contaminated contamination reactor pressure vessel containment cooling
  • "fukushima daiichi" nuclear reactor accident seawater contamination iodine tunnel trench TEPCO NISA JAIF
  • "fukushima daiichi" nuclear reactor accident site update status project future
  • "fukushima daiichi" nuclear reactor accident sodium silicate liquid glass diagram drawing perspective pipe tunnel trench contamination sea seawater
  • "fukushima daiichi" nuclear reactor accident TEPCO NISA JAIF update
  • "fukushima daiichi" nuclear reactor accident update TEPCO JAIF NISA
  • "fukushima daiichi" nuclear reactor accident water leakage contamination workers found dead
  • "fukushima"
  • "gas cooled"
  • "genkai"
  • "genkai" "embrittlement" "brittle" "pressure vessel"
  • "genkai" "kyushu"
  • "hack job"
  • "hallam"
  • "head"
  • "hearing"
  • "hearings"
  • "higashidori"
  • "hitachi"
  • "HNPF"
  • "hurricane"
  • "hydrogen"
  • "IAEA"
  • "icebreaker"
  • "IFR"
  • "INES"
  • "injection"
  • "irene"
  • "irrelevant"
  • "jaczko"
  • "jaczko" "NRC"
  • "JAIF"
  • "japan"
  • "kurion"
  • "kyushu"
  • "laguna verde"
  • "lenin"
  • "licensing"
  • "loop"
  • "lunch"
  • "marcoule"
  • "mark I"
  • "melt"
  • "meltdown"
  • "mexico"
  • "mitsubishi"
  • "MK I" "containment" "suppression" "youtube" "video"
  • "mPower"
  • "mPower" "Bechtel" "TVA" "babcock"
  • "national nuclear science week"
  • "nei"
  • "new nuclear"
  • "NISA"
  • "nitrogen"
  • "no 5"
  • "no 6"
  • "north anna"
  • "NRC"
  • "NRTS"
  • "nuclear aftershocks"
  • "nuclear energy institute"
  • "nuclear history"
  • "nuclear icebreaker"
  • "office for nuclear regulation"
  • "op-ed"
  • "op-ed" "carnival"
  • "op-ed" "fukushima daiichi"
  • "opinion"
  • "oversight"
  • "palisades"
  • "pbs"
  • "peer review"
  • "poll"
  • "PRA"
  • "press"
  • "pressure vessel"
  • "pressurized thermal shock"
  • "primary to secondary leak"
  • "PTS"
  • "public attitudes"
  • "PWR"
  • "RBMK-1000"
  • "RBMK-1500"
  • "RBMK-2400"
  • "RBMK"
  • "reactor safety"
  • "reading list"
  • "recriticality"
  • "Reid"
  • "reporting"
  • "restart"
  • "risk"
  • "robot"
  • "rod adams" "glenn williams" "interview" "atomic show" "the street"
  • "safety"
  • "san onofre"
  • "sarry"
  • "SBO"
  • "sheldon station"
  • "shippingport"
  • "SMR"
  • "solar"
  • "songs"
  • "south africa"
  • "south texas project"
  • "spent fuel"
  • "SSBN"
  • "steam generator"
  • "steam generators"
  • "steel"
  • "stress tests"
  • "submarine"
  • "support"
  • "Svinicki"
  • "sylcor"
  • "sylvania-corning"
  • "TEPCO"
  • "tepco" "tohoku" "kyushu" "japan"
  • "TMI"
  • "tokyo electric"
  • "Toshiba"
  • "twitter"
  • "UK"
  • "update"
  • "vermont yankee"
  • "vessel"
  • "video"
  • "virgil c summer"
  • "virginia"
  • "vogtle"
  • "wash-1250"
  • "WASH"
  • "westinghouse"
  • "westinghouse" "AP1000" "NRC"
  • "xenon"
  • "youtube"
  • ANO
  • ANS
  • arkansas nuclear one
  • Babcock
  • brittle fracture
  • brookhaven
  • carnival
  • crystal river
  • decommissioning
  • earthquake
  • enriched uranium
  • Entergy
  • fintan dunne
  • FirstEnergy
  • fresno
  • fuel elements
  • fukushima daiichi
  • higashidori
  • hurricane
  • hurricanes
  • industrial accident
  • INES
  • kashiwazaki kariwa TEPCO earthquake
  • kenya
  • license amendment
  • MHI
  • mitsubishi
  • mPower
  • NEI
  • northern fleet
  • nrc
  • nuclear electricity project
  • nuclear history
  • nuclear submarines
  • onagawa tohoku leak earthquake
  • OSHA
  • oyster creek
  • palisades
  • press release
  • pressurized thermal shock
  • PTS
  • retire
  • russian navy
  • san onofre
  • sandy
  • sce
  • sherrell r greene
  • shutdown
  • SMR
  • socal ed
  • songs
  • southern california edison
  • spent fuel
  • spent fuel pool
  • spent fuel pools
  • status
  • steam generator
  • steam generators
  • surry
  • sustainable energy today
  • sylcor
  • sylvania-corning
  • TEPCO
  • tohoku electric power higashidori onagawa LOOP fuel pool cooling
  • tokyo electric power company
  • unusual event

Blog Archive

  • ►  2013 (71)
    • ►  October (5)
    • ►  September (5)
    • ►  August (9)
    • ►  July (5)
    • ►  June (6)
    • ►  May (2)
    • ►  April (8)
    • ►  March (13)
    • ►  February (13)
    • ►  January (5)
  • ►  2012 (159)
    • ►  December (6)
    • ►  November (7)
    • ►  October (13)
    • ►  September (7)
    • ►  August (19)
    • ►  July (15)
    • ►  June (16)
    • ►  May (17)
    • ►  April (13)
    • ►  March (14)
    • ►  February (14)
    • ►  January (18)
  • ▼  2011 (270)
    • ►  December (22)
    • ►  November (21)
    • ►  October (20)
    • ►  September (21)
    • ►  August (17)
    • ►  July (23)
    • ►  June (24)
    • ▼  May (44)
      • Fukuishi LIVE Fukushima Daiichi Camera
      • Fukushima Daiichi... Sunday 5/29
      • Fukushima Daiici Video; Dust Inhibitor
      • Fukushima Daiichi Update: Friday 5/27
      • Westinghouse responds to the NRC... in print, in p...
      • Westinghouse AP1000 ... Who is on which side?
      • Second Wednesday update (5/25)
      • Fukushima Daiichi details... Wed. May 25
      • Fukushima Daiichi No. 2 and No. 3
      • Fukushima Daiichi update: Monday, 5/23
      • Brief Fukushima Daiichi update- Sunday 5/22
      • Fukushima Daiichi update; Friday evening 5/20
      • TEPCO Board Meeting
      • Fukushima Daiichi Update... Thursday, 5/19
      • Fukushima Daiichi update, Weds. morning 5/18
      • TEPCO Video
      • Fukushima Daiichi update: Tuesday 5/17
      • BWR Pressure Vessel illustrations
      • Further Fukushima Daiichi updates 5/15
      • Core totally demolished at Fukushima Daiichi No. 1
      • Fukushima Daiichi No. 1: Core melt / exit of pres...
      • View of cooling equipment for TEPCO
      • Hamaoka No. 4 shut down; No. 5 to follow
      • NISA responds to TEPCO plan to fill dry well at No...
      • Fukushima Daiichi No. 1: Meltdown?
      • Fukushima Daiichi No. 1 - estimates worsen
      • TEPCO, NISA: Serious water loss at No. 1 plant
      • Fresno Nuclear Energy Group
      • TEPCO rapidly halts water flow to cable pit at No....
      • Fukushima Daiichi update; Wednesday 5/11
      • Fukushima Daiichi updates
      • TEPCO: New equipment illustrations
      • High rad levels: Fukushima Daiichi No. 1
      • Hamaoka will shut down after all
      • Japan updates: Fukushima Daiichi, Hamaoka
      • Chubu Electric / Hamaoka details....
      • Japanese government / Chubu Electric Hamaoka shutdown
      • TEPCO press photos
      • Fukushima Daiichi updates... May 5th
      • TEPCO responds to NISA on reactor building, and more
      • Fukushima Daiichi update: Wednesday morning May 4
      • US Nuclear Plant News; Browns Ferry, Nine Mile Point
      • Fuel element failure possible at Tsuruga No. 2
      • Sunday evening update
    • ►  April (78)
Powered by Blogger.

About Me

Unknown
View my complete profile