Mitsubishi Tech Support

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Saturday, 14 May 2011

Fukushima Daiichi No. 1: Core melt / exit of pressure vessel speculated by TEPCO, NISA

Posted on 19:31 by Unknown
There are a number of very serious reports on the various Japanese news media at this moment; we will report these and make commentary in a sober fashion.

NHK is carrying the report, from TEPCO apparently, that there is a hole in the bottom head of the pressure vessel at No. 1 plant. This appears to be in addition to the previously reported piping damage, although another report does indicate water leakage from piping connected to the primary plant occurring in the turbine building. JAIF's now-irregular status reports do now indicate probable damage and leakage in terms of the reactor pressure vessel and also the primary containment at the No. 1 reactor plant.

Link to the most recent JAIF status report.

Combining this estimation... the presence of a hole in the lower reactor pressure vessel head... with the previous information gleaned sporadically over time may in fact indicate a corium/concrete reaction has, or had, occurred. The source and routing of the large amount of hydrogen which destroyed the reactor building has not been adequately explained up until this point; partial corium exit from the reactor vessel into the dry well and the corium/concrete reaction that would result could help explain the violent destruction of the reactor building.

From ORNL "The Role of BWR Secondary Containments in Severe Accident Mitigation: Issue and Insights from Recent Analyses":

The reaction of the hot core debris with the primary containment concrete
would proceed in a very complex manner, releasing fission product vapors,
fission product-laden aerosols, additional hydrogen, carbon dioxide, carbon
monoxide, and water vapor. The exact mix of gases generated by the
core/concrete reaction is a function of the type of concrete employed, and the
amount of un-oxidized Zircaloy leaving the reactor vessel. It should be noted
that in an unmitigated BWR severe accident the entire Zircaloy inventory of
the reactor would eventually oxidize (either in the reactor vessel or on the
drywell floor), generating as much as 6000 lb (2722 kg) of hydrogen (plant
specific value).


I mentioned aerosolized fission product gases a long time ago on this blog.

Seven hundred pounds of hydrogen are thought to have burned inside the containment vessel at Three Mile Island No. 2 during that core damage accident, causing a pressure pulse of about 28 pounds. The effect of six thousand pounds, or even three quarters of that, might well explain the sheer devastation seen at the Fukushima Daiichi plant reactor buildings.

It would not be inconceivable that salt played a role in the failure, either; either by corrosion, or else by blockage of cooling water, or even of sheer mass inside the pressure vessel. These effects, or others due to salt, will remain only theories until the vessel is actually opened, which could take a decade.

All of the above hinges of course on the assumption that some or all of the core material exited the pressure vessel. As has been noted in a number of ORNL studies, and studies sponsored by others, it may be exceedingly difficult .. especially faced with the loss of indication attendant to a long-term station SBO casualty .. to determine whether or not the core actually has begun to fully melt down, to reach the bottom head, or to begin to exit the bottom head. (The early initiation of dry well flooding, which occurred very early in the accident timeline and which was then stopped, only to very recently be restarted, is a primary mitigation / control option to prevent a known melting core from exiting the pressure vessel as rapidly as it would without any direct water contact with the lower head.)

Some studies indicate that rad levels soon after the accident might help indicate vessel failure, as well as pressure vessel pressure. Very high rad levels were reported after the accidents, and we know when the pressure began to rise in the primary containments which in two cases shortly preceded massive hydrogen explosions which destroyed No. 1 and No. 3 reactor buildings. These events... the high rad levels, and the pressure pulses, may in fact have been indicative of the pressure vessel failure(s). It must be remembered, though, that the situation we are seeing at Fukushima Daiichi is one that has only ever been postulated, simulated, discussed, calculated and proceduralized to the highest point possible but is still, up until now perhaps, totally unseen in operating reactor plants and thus is still somewhat of a gray area.

TEPCO has reported over 3000 tons of highly contaminated water in No. 1 plant turbine building, with the amount increasing fairly rapidly. There is now absolutely no doubt in any quarters that TEPCO has lost containment on this plant.

The reports driving this post, at least in original detail, are lacking in many specifics which is why I've made this rather long post, given the facts, with informed speculation and commentary in order that we can all as either expert observers or as lay people begin to get our heads around the possibilities enumerated by the assumption of core melt and exit of the pressure vessel, at least in part.

11:10 PM Eastern Saturday 5/14
ATOMIC POWER REVIEW
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Posted in "fukushima daiichi" "tepco" "nisa" | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Nitrogen inerting drywells..
    Apparently the nitrogen injection to the drywell on No. 1 plant continues... and TEPCO has made a fairly revealing press release which inclu...
  • NuSource LLC - Press Release
    Press release on formation of NuSource LLC follows. MPR & Gavial Form Joint Venture, NuSource LLC, to Address Nuclear Industry Obsolesce...
  • Nuclear Icebreakers 101
    An addendum for National Nuclear Science Week - Day 3 In the previous post I gave the briefest overview of the history of the Russian fleet ...
  • Davis-Besse vessel head replacement
    As reported on the NRC blog, Davis-Besse has been shut down for replacement of its pressure vessel head. This plant is a Babcock & Wilco...
  • Atomic History: Dresden-1
    In one of our previous discussions concerning the nature of reactor plant containment, we made considerable effort to detail the very early ...
  • Carnival 81 on line now
    Dan Yurman has posted the 81st Carnival of Nuclear Bloggers over at his fine blog, "Idaho Samizdat." APR's post on the Decembe...
  • San Onofre seismic study - Press release 4/27
    Press release below from SoCal Ed. Some very interesting news about a cooperative project to further investigate the seismic environment at...
  • An interesting week, to say the least.
    This has indeed been an interesting week for those who follow the news in nuclear energy. Here is a brief recap from my perspective. NRC CH...
  • Hurricane Irene approaching Eastern U.S.
    Probably no one at this point could do better than Brian Wheeler did at POWER ENGINEERING with the following article (link below) concerning...
  • Brief Fukushima Daiichi update- Sunday 5/22
    As reported on this blog on April 23, TEPCO has (again) noted the discovery of radioactive debris on the Fukushima Daiichi site which is emi...

Categories

  • " fukushima daiichi"
  • "accident"
  • "alloy"
  • "ameren"
  • "american nuclear society"
  • "annealing"
  • "anniversary"
  • "ans"
  • "anti-nuclear"
  • "AP1000"
  • "arco"
  • "areva"
  • "asn"
  • "associated press" "NRC" "NEI"
  • "atomic journal"
  • "babcock"
  • "blackout"
  • "bloggers"
  • "boron"
  • "brazil"
  • "breeder reactor"
  • "breeder"
  • "browns ferry"
  • "browns ferry" "nine mile point"
  • "BWR"
  • "calhoun"
  • "callaway"
  • "carnival"
  • "chernobyl"
  • "china"
  • "chubu electric" "hamaoka"
  • "chubu" "hamaoka"
  • "chubu" "hamaoka" "tepco" "fukushima daiichi"
  • "chubu" "kyushu" "nisa"
  • "COL"
  • "commissioners"
  • "containment"
  • "contaminated"
  • "cooling"
  • "cooper" "ft calhoun" "flood" "missouri river"
  • "core damage"
  • "criticality"
  • "davis-besse"
  • "delta IV"
  • "dresden" "boiling water reactor" "containment"
  • "dry dock"
  • "dry well"
  • "earth day"
  • "earthquake"
  • "EBR"
  • "ebwr"
  • "education"
  • "elk river"
  • "embrittlement"
  • "enclosure"
  • "energy policy"
  • "equipment"
  • "fabrication"
  • "fermi"
  • "fire"
  • "flood"
  • "frontline"
  • "ft calhoun"
  • "ft calhoun" "oppd" "flood"
  • "ft st vrain"
  • "fukushima daiichi"
  • "fukushima daiichi" "BWR"
  • "fukushima daiichi" "nisa" "tepco"
  • "fukushima daiichi" "tepco"
  • "fukushima daiichi" "tepco" "dry well" "containment" "pressure vessel"
  • "fukushima daiichi" "tepco" "iaea"
  • "fukushima daiichi" "tepco" "kurion" "areva"
  • "fukushima daiichi" "tepco" "nisa"
  • "fukushima daiichi" "tepco" "nisa" "genkai" "pressure vessel"
  • "fukushima daiichi" "tepco" "nisa" "jaif"
  • "fukushima daiichi" "tepco" "nisa" "japan"
  • "fukushima daiichi" "tepco" "nisa" "jsc" "road map" "recovery"
  • "fukushima daiichi" "tepco" "nisa" "spent fuel" "pool"
  • "fukushima daiichi" "tepco" "nitrogen"
  • "fukushima daiichi" "tepco" "robot" "video"
  • "fukushima daiichi" "tepco" "tokai" "japco" "iaea"
  • "fukushima daiichi" "tepco" "tomari" "hokkaido"
  • "fukushima daiichi" "tepco" "tsunami"
  • "fukushima daiichi" "tepco" "video"
  • "fukushima daiichi" "tepco" "video" "youtube"
  • "fukushima daiichi" "TMI" "public opinion" "survey"
  • "fukushima daiichi" "video"
  • "fukushima daiichi" 7 8 plants economic plan TEPCO
  • "fukushima daiichi" cooling water release sea ocean nuclear reactor accident NISA TEPCO pit trench tunnel
  • "fukushima daiichi" nuclear reactor accident contaminated water barge Suzuran Rosatom TEPCO
  • "fukushima daiichi" nuclear reactor accident contaminated water sea radwaste condensers nitrogen hydrogen inert
  • "fukushima daiichi" nuclear reactor accident earthquake onagawa TEPCO tohoku BWR nitrogen
  • "fukushima daiichi" nuclear reactor accident IAEA TEPCO update briefing temperatures pressures
  • "fukushima daiichi" nuclear reactor accident japan update color dye containment fabric update
  • "fukushima daiichi" nuclear reactor accident leakage sea seawater contamination tunnel trench cable pit
  • "fukushima daiichi" nuclear reactor accident liquid glass sodium silicate TEPCO
  • "fukushima daiichi" nuclear reactor accident nitrogen hydrogen inert dry well drywell
  • "fukushima daiichi" nuclear reactor accident nitrogen inert radiolytic radiolysis hydrogen
  • "fukushima daiichi" nuclear reactor accident polymer leak concrete contaminated contamination reactor pressure vessel containment cooling
  • "fukushima daiichi" nuclear reactor accident seawater contamination iodine tunnel trench TEPCO NISA JAIF
  • "fukushima daiichi" nuclear reactor accident site update status project future
  • "fukushima daiichi" nuclear reactor accident sodium silicate liquid glass diagram drawing perspective pipe tunnel trench contamination sea seawater
  • "fukushima daiichi" nuclear reactor accident TEPCO NISA JAIF update
  • "fukushima daiichi" nuclear reactor accident update TEPCO JAIF NISA
  • "fukushima daiichi" nuclear reactor accident water leakage contamination workers found dead
  • "fukushima"
  • "gas cooled"
  • "genkai"
  • "genkai" "embrittlement" "brittle" "pressure vessel"
  • "genkai" "kyushu"
  • "hack job"
  • "hallam"
  • "head"
  • "hearing"
  • "hearings"
  • "higashidori"
  • "hitachi"
  • "HNPF"
  • "hurricane"
  • "hydrogen"
  • "IAEA"
  • "icebreaker"
  • "IFR"
  • "INES"
  • "injection"
  • "irene"
  • "irrelevant"
  • "jaczko"
  • "jaczko" "NRC"
  • "JAIF"
  • "japan"
  • "kurion"
  • "kyushu"
  • "laguna verde"
  • "lenin"
  • "licensing"
  • "loop"
  • "lunch"
  • "marcoule"
  • "mark I"
  • "melt"
  • "meltdown"
  • "mexico"
  • "mitsubishi"
  • "MK I" "containment" "suppression" "youtube" "video"
  • "mPower"
  • "mPower" "Bechtel" "TVA" "babcock"
  • "national nuclear science week"
  • "nei"
  • "new nuclear"
  • "NISA"
  • "nitrogen"
  • "no 5"
  • "no 6"
  • "north anna"
  • "NRC"
  • "NRTS"
  • "nuclear aftershocks"
  • "nuclear energy institute"
  • "nuclear history"
  • "nuclear icebreaker"
  • "office for nuclear regulation"
  • "op-ed"
  • "op-ed" "carnival"
  • "op-ed" "fukushima daiichi"
  • "opinion"
  • "oversight"
  • "palisades"
  • "pbs"
  • "peer review"
  • "poll"
  • "PRA"
  • "press"
  • "pressure vessel"
  • "pressurized thermal shock"
  • "primary to secondary leak"
  • "PTS"
  • "public attitudes"
  • "PWR"
  • "RBMK-1000"
  • "RBMK-1500"
  • "RBMK-2400"
  • "RBMK"
  • "reactor safety"
  • "reading list"
  • "recriticality"
  • "Reid"
  • "reporting"
  • "restart"
  • "risk"
  • "robot"
  • "rod adams" "glenn williams" "interview" "atomic show" "the street"
  • "safety"
  • "san onofre"
  • "sarry"
  • "SBO"
  • "sheldon station"
  • "shippingport"
  • "SMR"
  • "solar"
  • "songs"
  • "south africa"
  • "south texas project"
  • "spent fuel"
  • "SSBN"
  • "steam generator"
  • "steam generators"
  • "steel"
  • "stress tests"
  • "submarine"
  • "support"
  • "Svinicki"
  • "sylcor"
  • "sylvania-corning"
  • "TEPCO"
  • "tepco" "tohoku" "kyushu" "japan"
  • "TMI"
  • "tokyo electric"
  • "Toshiba"
  • "twitter"
  • "UK"
  • "update"
  • "vermont yankee"
  • "vessel"
  • "video"
  • "virgil c summer"
  • "virginia"
  • "vogtle"
  • "wash-1250"
  • "WASH"
  • "westinghouse"
  • "westinghouse" "AP1000" "NRC"
  • "xenon"
  • "youtube"
  • ANO
  • ANS
  • arkansas nuclear one
  • Babcock
  • brittle fracture
  • brookhaven
  • carnival
  • crystal river
  • decommissioning
  • earthquake
  • enriched uranium
  • Entergy
  • fintan dunne
  • FirstEnergy
  • fresno
  • fuel elements
  • fukushima daiichi
  • higashidori
  • hurricane
  • hurricanes
  • industrial accident
  • INES
  • kashiwazaki kariwa TEPCO earthquake
  • kenya
  • license amendment
  • MHI
  • mitsubishi
  • mPower
  • NEI
  • northern fleet
  • nrc
  • nuclear electricity project
  • nuclear history
  • nuclear submarines
  • onagawa tohoku leak earthquake
  • OSHA
  • oyster creek
  • palisades
  • press release
  • pressurized thermal shock
  • PTS
  • retire
  • russian navy
  • san onofre
  • sandy
  • sce
  • sherrell r greene
  • shutdown
  • SMR
  • socal ed
  • songs
  • southern california edison
  • spent fuel
  • spent fuel pool
  • spent fuel pools
  • status
  • steam generator
  • steam generators
  • surry
  • sustainable energy today
  • sylcor
  • sylvania-corning
  • TEPCO
  • tohoku electric power higashidori onagawa LOOP fuel pool cooling
  • tokyo electric power company
  • unusual event

Blog Archive

  • ►  2013 (71)
    • ►  October (5)
    • ►  September (5)
    • ►  August (9)
    • ►  July (5)
    • ►  June (6)
    • ►  May (2)
    • ►  April (8)
    • ►  March (13)
    • ►  February (13)
    • ►  January (5)
  • ►  2012 (159)
    • ►  December (6)
    • ►  November (7)
    • ►  October (13)
    • ►  September (7)
    • ►  August (19)
    • ►  July (15)
    • ►  June (16)
    • ►  May (17)
    • ►  April (13)
    • ►  March (14)
    • ►  February (14)
    • ►  January (18)
  • ▼  2011 (270)
    • ►  December (22)
    • ►  November (21)
    • ►  October (20)
    • ►  September (21)
    • ►  August (17)
    • ►  July (23)
    • ►  June (24)
    • ▼  May (44)
      • Fukuishi LIVE Fukushima Daiichi Camera
      • Fukushima Daiichi... Sunday 5/29
      • Fukushima Daiici Video; Dust Inhibitor
      • Fukushima Daiichi Update: Friday 5/27
      • Westinghouse responds to the NRC... in print, in p...
      • Westinghouse AP1000 ... Who is on which side?
      • Second Wednesday update (5/25)
      • Fukushima Daiichi details... Wed. May 25
      • Fukushima Daiichi No. 2 and No. 3
      • Fukushima Daiichi update: Monday, 5/23
      • Brief Fukushima Daiichi update- Sunday 5/22
      • Fukushima Daiichi update; Friday evening 5/20
      • TEPCO Board Meeting
      • Fukushima Daiichi Update... Thursday, 5/19
      • Fukushima Daiichi update, Weds. morning 5/18
      • TEPCO Video
      • Fukushima Daiichi update: Tuesday 5/17
      • BWR Pressure Vessel illustrations
      • Further Fukushima Daiichi updates 5/15
      • Core totally demolished at Fukushima Daiichi No. 1
      • Fukushima Daiichi No. 1: Core melt / exit of pres...
      • View of cooling equipment for TEPCO
      • Hamaoka No. 4 shut down; No. 5 to follow
      • NISA responds to TEPCO plan to fill dry well at No...
      • Fukushima Daiichi No. 1: Meltdown?
      • Fukushima Daiichi No. 1 - estimates worsen
      • TEPCO, NISA: Serious water loss at No. 1 plant
      • Fresno Nuclear Energy Group
      • TEPCO rapidly halts water flow to cable pit at No....
      • Fukushima Daiichi update; Wednesday 5/11
      • Fukushima Daiichi updates
      • TEPCO: New equipment illustrations
      • High rad levels: Fukushima Daiichi No. 1
      • Hamaoka will shut down after all
      • Japan updates: Fukushima Daiichi, Hamaoka
      • Chubu Electric / Hamaoka details....
      • Japanese government / Chubu Electric Hamaoka shutdown
      • TEPCO press photos
      • Fukushima Daiichi updates... May 5th
      • TEPCO responds to NISA on reactor building, and more
      • Fukushima Daiichi update: Wednesday morning May 4
      • US Nuclear Plant News; Browns Ferry, Nine Mile Point
      • Fuel element failure possible at Tsuruga No. 2
      • Sunday evening update
    • ►  April (78)
Powered by Blogger.

About Me

Unknown
View my complete profile